This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued.
Solicitation number 1240LT26Q0172 is issued as a Request for Quotation (RFQ) for MARK
TWAIN NATIONAL FOREST COUNCIL BLUFF PRIMARY ELECTRIC AND WELL
IMPROVEMENTS.
This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 283210. The small business size standard is $19 million. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
The Work consists of coordinating with Ameren to extend their existing primary electric line from an overhead power line located near Missouri State Highway DD to the Wild Boar Campground. This includes coming off an existing electric pole on the east side of the highway and installing buried line along the edge of the cleared highway right-of-way to the existing well within the Council Bluff Recreation Area. The corridor will parallel the east side of Missouri State Highway DD for approximately 9,600 feet and then use an “old road corridor” along the top of Wild Boar Ridge leading to the well for approximately 3,100 feet.
The Contractor shall coordinate with Ameren to extend their existing primary electric line from an overhead power line near Missouri State Highway DD to the Wild Boar Campground. This includes coming off an existing electric pole on the east side of the highway and installing buried line along the edge of the cleared highway right-of-way to the existing well within the Council Bluff Recreation Area. The corridor will parallel the east side of Missouri State Highway DD for approximately 9,600 feet and then use an old road corridor along the top of Wild Boar Ridge leading to the well for approximately 3,100 feet. The Contractor shall clear the old road corridor as necessary to allow construction vehicle access. A pull box will be placed at approximately every 500 feet along the buried cable. The electric line along Missouri State Highway DD shall be installed utilizing directional drilling methods. The electric line along the old road corridor can be installed utilizing either directional drilling or trenching. The Contractor shall coordinate with Ameren to obtain all permits, pay all fees, and provide all labor, materials and equipment to extend the primary distribution system which includes transformers, meter bases, metering, and service connection requirements. The work also includes replacing the existing water supply well's pump, drop pipe, pitless adaptor, well cap, and other related appurtenances; connecting the existing well into the new electric system; and other work indicated in the Contract Documents. The Contractor's electrician shall provide plans for transformer sizing based on future needs including a new well house building with a 200 AMP panel, 2 host campsites with 50/30/20 AMP RV pedestals, 40 campsites with 50/30/20 AMP RV pedestals, a septic system with 2 – 230V sewage pumps, and the existing well with submersible pump.
We post new appliances opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""59901""KALISPELL""MT""USA""WESTERN MONTANA ACQUISITION ZONE""650 WOLFPACK WAY""1240LT26Q0172_SF1442.pdf"104024"file"".pdf""1""2026-08-28T17:44:24.271+00:00""34060f0620a3448bb0ea4ccc88d625ee""public""0""public""8afb9b8aeaa44f23ac1d192d758e8095""0"21"0""1 Solicitation0_Council Bluff Primary Electric and Well Improvements.pdf"942465"file"".pdf""1""2026-08-28T17:44:24.271+00:00""d5a1702b11d84b3eb9f598240f0fae1c""public""0""public""aef9086d8c014b819ab39e587752e1cb""0"20"0""2 CBPEWI_SOI.pdf"174290"file"".pdf""1""2026-08-28T17:44:24.271+00:00""5902a8d5f421446b9f2e8108ca6bb3aa""public""0""public""96be5b984bb746dbbb2fd912dc5bc41d""0"17"0""3 Combined SpecsCBPEWI20260624.pdf"3118287"file"".pdf""1""2026-08-28T17:44:24.271+00:00""5fba5c376e924ab9a92f1e00f2a64431""public""0""public""f921f6bbd0974e10b138bf4f7684a7b5""0"14"0""4 Combined Drawings_CBPEWI.pdf"645921"file"".pdf""1""2026-08-28T17:44:24.271+00:00""b949497d8119421d80224d7a6a964b6e""public""0""public""4f24eae3beac435ab2892b2571004f2c""0"10"0""5_WD_MO20260001_07302026.pdf"127304"file"".pdf""1""2026-08-28T17:44:24.271+00:00""1918506e70f44769bcd6f0aa2b48965d""public""0""public""0f74061362db4592be726bb355d0d872""0"6"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice af8a50fc109741a38429160b6ff92099), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.