We post new goods & materials opportunities in Florida as agencies publish them. Get them in one email — free, and unsubscribe whenever.
The purpose of this amendment is to extend the solicitation due date, provide responses to vendor questions and to clarify the requirements of the solicitation. See attached.
The contractor shall supply all labor, materials, hardware, accessories, and supervision to purchase, deliver, set in place and provide factory startup of a hot water boiler for the building 24 HVAC system. The boiler must be 500,000 BTU with 10:1 turndown, 97% thermal efficiency, 120V 1 PH power, natural gas, and include a BACnet/MSTP card, condensate neutralization kit, 1/2 hp boiler pump with 2" flange, magnetic filter assembly, CO/gas detector with solenoid valve, two EPO switches, and a factory-installed combustion air filter. The contractor must provide one onsite meeting post-delivery and one onsite visit post-utility connection for commissioning. Connection of power, gas, water, vent, and supply air will be by others.
"US""33637""TAMPA""FL""USA""8875 HIDDEN RIVER PARKWAY""36C24826Q1038 0001.docx"23629"file"".docx""1""2026-08-05T15:10:17.884+00:00""c530ac3550e64befb8dbcae4ca2bbe33""public""0""public""51f0dcf01bad400faaede5884e895454""0"2"0""36C24826Q1038.docx"100362"file"".docx""1""2026-07-29T14:49:18.098+00:00""60560944b989483284de6c17248973ee""public""0""public""de7363503b6547f6bbeb4fff91a757ed""0"1"0"Source: SAM.gov (notice ace651c6c7c74005a69b2c4614467dfa), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.