Replacement of existing lift station wet well equipment and appurtenances nearing the end oftheir service life, including pumps, guide rails, base elbows, piping, and level instrumentation.Work includes recoating the wet well interior for corrosion protection and installation of safetygrates beneath access hatches to enhance safety. Construction is limited to the wet well, with noimprovements to the valve vault or metering chamber.
Replacement of existing lift station wet well equipment and appurtenances nearing the end of their service life, including pumps, guide rails, base elbows, piping, and level instrumentation. Work includes recoating the wet well interior for corrosion protection and installation of safety grates beneath access hatches to enhance safety. Construction is limited to the wet well, with no improvements to the valve vault or metering chamber.
We post new plumbing opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
["https://procure.cgieva.com/page.aspx/en/fil/download_public/D293B8F6-6FD5-4ECA-A27B-03AC575A7264","https://procure.cgieva.com/page.aspx/en/fil/download_public/8B7A0789-680E-48B0-80F7-450803982B89"]["<a href=\"\"https://procure.cgieva.com/page.aspx/en/fil/download_public/D293B8F6-6FD5-4ECA-A27B-03AC575A7264\"\">Bidding Documents - FCWSA 191405.pdf</a>","<a href=\"\"https://procure.cgieva.com/page.aspx/en/fil/download_public/8B7A0789-680E-48B0-80F7-450803982B89\"\">Invitation For Bid.pdf</a>"]["D293B8F6-6FD5-4ECA-A27B-03AC575A7264","8B7A0789-680E-48B0-80F7-450803982B89"]["Bidding Documents - FCWSA 191405.pdf","Invitation For Bid.pdf"]["9380748","81419"]"http://www.w3.org/2001/XMLSchema-instance"["9/14/26","9/14/26"]["Bid Documents","Invitation for Bid "]["RFx Document","RFx Document"]Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Virginia eVA (solicitation IV128357), retrieved via Virginia's eVA statewide eProcurement marketplace. View the official posting, and always confirm requirements and deadlines with the issuing agency.