Work under this Rehabilitation Project will take place within a portion of the City’s 1200 W sewer trunk line located along 1300 S, from State Street to 700 West.
The Work generally includes, but is not limited to, the following:
• Water-cured CIPP Rehabilitation of approximately 6,386 LF of 48-inch, 54-inch, and 60-inch diameter RCP trunk line.
• Furnishing, installation and uninterrupted maintenance/oversight of a flow control bypass pumping system of the trunk line, including odor control, tributary and sewer service lateral connections.
• Groundwater management as required for CIPP and manhole rehabilitation, including any treatment, handling and disposal in accordance with applicable permits and regulations.
• Permitting with Salt Lake City Right of Way and Traffic Control, UDOT, UPRR, and UTA.
• Rehabilitation of 16 manholes with an epoxy coating system.
• Cleaning, video inspection of the existing trunk line, location of existing active laterals and completion of all necessary spot repairs for CIPP rehabilitation.
• Reconnection of all active laterals and disconnection of inactive laterals to the rehabilitated trunk line.
• Completion of post construction testing and video inspection of the rehabilitated trunk line and manholes.
• Coordinating with other agencies and performing public relations and outreach activities during construction.
We post new plumbing opportunities in Utah as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Utah work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: State of Utah (Bonfire) (solicitation 248870), retrieved via the Utah Bonfire procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.