We'll email you new asphalt opportunities in Utah as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
THIS PROJECT REQUIRES USING THE ELECTRONIC CERTIFIED PAYROLL PROGRAM. SEE ATTACHMENT TO NOTICE TO CONTRACTORS.
THIS IS A P+T (PRICE + TIME) PROJECT.
THE DEPARTMENT WILL NOT HOLD RETENTION ON THIS PROJECT. PER UTAH STATE CODE § 13-8-5 (1) PRIME CONTRACTORS CANNOT HOLD RETENTION. REFER TO UTAH CODE § 13-8-5 (1) FOR MORE INFORMATION.
The work includes mobilization, traffic control, survey, 1-1/2-inch rotomilling and HMHMA 1/2-inch paving with Relative Automated Machine Guidance milling, emulsified asphalt tack, reconstruction of valve boxes, manholes and pedestrian access ramps, precast concrete barrier removal and installation with crash cushions, untreated base course and shouldering, broadcast seed, pavement markings, preformed thermoplastic messages, signs and posts, and contract time bidding as a Price + Time project on US-189 MP 3.43 to 7.45 in Utah County.
"Feature"{"type":"LineString","coordinates":[[-111.658609704547,40.2557141314384],[-111.658609544388,40.2557955516481],[-111.658595790339,40.256074918385],[-111.658584186793,40.2588804813031],[-111.658577115342,40.2608193227163],[-111.658577196847,40.2615553818213],[-111.658569142928,40.2623013973588],[-111.658568929081,40.2633708018342],[-111.658491581844,40.2638838707962],[-111.658395659164,40.264300645928],[-111.657677878497,40.2668102113903],[-111.65759740806,40.2671232910334],[-111.657306790275,40.268082629492],[-111.657131747124,40.2687106700133],[-111.657091457817,40.2689226170219],[-111.657025427194,40.2693914747971],[-111.656949287128,40.2702499513295],[-111.656967453485,40.2704985945039],[-111.656970175952,40.2710716595219],[-111.657033673001,40.2718964590976],[-111.657106714709,40.2724920082356],[-111.657234678865,40.273414822698],[-111.657280363037,40.2737477263162],[-111.657315686936,40.2739945600566],[-111.657366683211,40.2742807653733],[-111.657376905514,40.2743646737615],[-111.657435670282,40.2749064280662],[-111.657682364305,40.2773991536273],[-111.657862763399,40.2786570836728],[-111.657990527707,40.2794355689233],[-111.658028952341,40.2797225658983],[-111.658159575762,40.2806620301577],[-111.658362226259,40.2820533494168],[-111.658489512086,40.2828418366418],[-111.658712888073,40.284270245033],[-111.658767869511,40.2848079650711],[-111.658774233394,40.2851847861954],[-111.658782380253,40.2856604287181],[-111.658754577327,40.2863955623434],[-111.658679477538,40.2870333948835],[-111.658518476932,40.2888087743689],[-111.658500442318,40.2889749175711],[-111.658474026339,40.2892230025845],[-111.658383593398,40.290136244663],[-111.658347424495,40.2905311458136],[-111.658319126948,40.2908400538821],[-111.658248263011,40.2914302927331],[-111.658163463122,40.2921364697103],[-111.658122221201,40.2923482414866],[-111.657961735033,40.2931724193985],[-111.657797109437,40.293861301628],[-111.657719168827,40.2942199523815],[-111.65741758463,40.2956129642171],[-111.657388643553,40.2957468258495],[-111.65725379724,40.2963895005854],[-111.656982043381,40.2976328780314],[-111.656735095233,40.2987656605125],[-111.656518444068,40.2997592578007],[-111.656361357475,40.3004885459727],[-111.6562266372,40.3010731988366],[-111.655904739915,40.3024160489231],[-111.655814991566,40.3028211624096],[-111.655493651165,40.3044302306219],[-111.655300916176,40.3055034209207],[-111.65521030833,40.3061491751144],[-111.655244799319,40.3070515242332],[-111.655250206017,40.3077206088867],[-111.65531572092,40.3084112454115],[-111.655454526245,40.3092573261677],[-111.65552600988,40.3095911633325],[-111.655641940892,40.3100184444563],[-111.655678620695,40.3101605822874],[-111.655722047139,40.3103918731616],[-111.655838468842,40.3108696028822],[-111.655918141289,40.3113196122271],[-111.655921758548,40.3115718498882],[-111.655895057777,40.3118530889379],[-111.65587282895,40.3119883532601],[-111.655739909557,40.3122386621421],[-111.655361255004,40.3131219094391],[-111.655332461294,40.3131869389229],[-111.655207992766,40.3134758287554]]}{"sponsor_name":"UTAH DEPT. OF TRANSPORTATION"}"Feature"{"type":"LineString","coordinates":[[-111.658609704547,40.2557141314384],[-111.658609544388,40.2557955516481],[-111.658595790339,40.256074918385],[-111.658584186793,40.2588804813031],[-111.658577115342,40.2608193227163],[-111.658577196847,40.2615553818213],[-111.658569142928,40.2623013973588],[-111.658568929081,40.2633708018342],[-111.658491581844,40.2638838707962],[-111.658395659164,40.264300645928],[-111.657677878497,40.2668102113903],[-111.65759740806,40.2671232910334],[-111.657306790275,40.268082629492],[-111.657131747124,40.2687106700133],[-111.657091457817,40.2689226170219],[-111.657025427194,40.2693914747971],[-111.656949287128,40.2702499513295],[-111.656967453485,40.2704985945039],[-111.656970175952,40.2710716595219],[-111.657033673001,40.2718964590976],[-111.657106714709,40.2724920082356],[-111.657234678865,40.273414822698],[-111.657280363037,40.2737477263162],[-111.657315686936,40.2739945600566],[-111.657366683211,40.2742807653733],[-111.657376905514,40.2743646737615],[-111.657435670282,40.2749064280662],[-111.657682364305,40.2773991536273],[-111.657862763399,40.2786570836728],[-111.657990527707,40.2794355689233],[-111.658028952341,40.2797225658983],[-111.658159575762,40.2806620301577],[-111.658362226259,40.2820533494168],[-111.658489512086,40.2828418366418],[-111.658712888073,40.284270245033],[-111.658767869511,40.2848079650711],[-111.658774233394,40.2851847861954],[-111.658782380253,40.2856604287181],[-111.658754577327,40.2863955623434],[-111.658679477538,40.2870333948835],[-111.658518476932,40.2888087743689],[-111.658500442318,40.2889749175711],[-111.658474026339,40.2892230025845],[-111.658383593398,40.290136244663],[-111.658347424495,40.2905311458136],[-111.658319126948,40.2908400538821],[-111.658248263011,40.2914302927331],[-111.658163463122,40.2921364697103],[-111.658122221201,40.2923482414866],[-111.657961735033,40.2931724193985],[-111.657797109437,40.293861301628],[-111.657719168827,40.2942199523815],[-111.65741758463,40.2956129642171],[-111.657388643553,40.2957468258495],[-111.65725379724,40.2963895005854],[-111.656982043381,40.2976328780314],[-111.656735095233,40.2987656605125],[-111.656518444068,40.2997592578007],[-111.656361357475,40.3004885459727],[-111.6562266372,40.3010731988366],[-111.655904739915,40.3024160489231],[-111.655814991566,40.3028211624096],[-111.655493651165,40.3044302306219],[-111.655300916176,40.3055034209207],[-111.65521030833,40.3061491751144],[-111.655244799319,40.3070515242332],[-111.655250206017,40.3077206088867],[-111.65531572092,40.3084112454115],[-111.655454526245,40.3092573261677],[-111.65552600988,40.3095911633325],[-111.655641940892,40.3100184444563],[-111.655678620695,40.3101605822874],[-111.655722047139,40.3103918731616],[-111.655838468842,40.3108696028822],[-111.655918141289,40.3113196122271],[-111.655921758548,40.3115718498882],[-111.655895057777,40.3118530889379],[-111.65587282895,40.3119883532601],[-111.655739909557,40.3122386621421],[-111.655361255004,40.3131219094391],[-111.655332461294,40.3131869389229],[-111.655207992766,40.3134758287554]]}{"sponsor_name":"UTAH DEPT. OF TRANSPORTATION"}"September 01, 2026"["The \"Bidding Schedule\" has been revised.","Item No. 5, 018927041 \"Reconstruct Valve Box - Lower\" has been added with a quantity of 5.","Item No. 6, 01892704P \"Reconstruct Valve Box - Raise (Rapid Set)\" has been added with a quantity of 5.","Item No. 7, 018927051 \"Reconstruct Manhole - Lower\" has been added with a quantity of 12.","Item No. 8, 01892705P \"Reconstruct Manhole - Raise (Rapid Set)\" has been added with a quantity of 12.","The \"Measurement and Payment\" has been revised.","Item No. 5, 018927041 Reconstruct Valve Box - Lower has been added.","Item No. 6, 01892704P Reconstruct Valve Box - Raise (Rapid Set) has been added.","Item No. 7, 018927051 Reconstruct Manhole - Lower has been added.","Item No. 8, 01892705P Reconstruct Manhole - Raise (Rapid Set) has been added.","Display: Plan Sheet RDDT-02 has been revised.","Rotomilling - Varies has been updated to Relative Automated Machine Guidance (RAMG) Milling.","Display: Plan Sheet SM-01 has been revised.","Items 018927041, 01892704P, 018927051, and 01892705P and their quantities have been added to the Summary of Items. Miscellaneous Summary has been updated to include these items and has been moved from SM-02 to SM-01.","Display: Plan Sheet SM-02 has been revised.","Miscellaneous Summary has been removed from this sheet and added to SM-01."]"F-0189(96)3 / 21746""1""US-189; SR-265 University Pkwy to 800 North Orem""September 10, 2026"["Special Provision 02740S – Highly Modified Asphalt Mix version 2 has been revised.","Bidders are requested to consider these revisions before submitting their bid."]"F-0189(96)3 / 21746""2""US-189; SR-265 University Pkwy to 800 North Orem""September 15, 2026"["The Bid Opening has been revised, changing the Bid Opening date from September 17, 2026, to September 29, 2026.","Plan Sheet 1 has been revised to add DT-02 to the Index of Sheets.","Plan Sheet DT-02 has been created and added to the plan set."]"F-0189(96)3 / 21746""3""US-189; SR-265 University Pkwy to 800 North Orem""September 24, 2026"["The Bid Opening has been revised. The Bid Opening date has been changed from September 29, 2026 to October 6, 2026.","The “Bidding Schedule” has been revised.","Item No. 18, 027717111 \"Reconstruct Pedestrian Access Ramp Remove Sidewalk\" quantity has been changed from 727 sq ft to 4,509 sq ft.","Item No. 21, 027717114 \"Reconstruct Pedestrian Access Ramp Remove PCCP\" quantity has been changed from 4,612 sq ft to 830 sq ft.","Item No. 22, 027717115 \"Reconstruct Pedestrian Access Ramp Sidewalk\" quantity has been changed from 727 sq ft to 4,724 sq ft.","Item No. 25, 027717118 \"Reconstruct Pedestrian Access Ramp PCCP\" quantity has been changed from 5,037 sq ft to 830 sq ft.","Display: Plan Sheet SM-01 has been revised. Summary of Items has been updated to match the Concrete Summary.","Display: Plan Sheet SM-03 has been revised. Reconstruct Pedestrian Ramp items “Remove Sidewalk”, “Remove PCCP”, “Sidewalk” and “PCCP” have been updated.","Display: Plan Sheet SM-04 has been revised. Reconstruct Pedestrian Ramp items “Remove Sidewalk”, “Remove PCCP”, “Sidewalk” and “PCCP” have been updated."]"F-0189(96)3 / 21746""4""US-189; SR-265 University Pkwy to 800 North Orem"{"Unit":"Lump","Line No":"3","ItemName":"Traffic Control","Quantity":"1.00","ItemNumber":"015547005"}{"Unit":"Ton","Line No":"15","ItemName":"HMHMA - 1/2 Inch","Quantity":"17,602.00","ItemNumber":"02740700*"}{"Unit":"sq yd","Line No":"29","ItemName":"Rotomilling - 1 1/2 Inch","Quantity":"201,496.00","ItemNumber":"029617025"}Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Utah Department of Transportation (solicitation 21746), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.