This project includes 10 non-ADA Jack and Jill suites, 3 single rooms with attached bathroom, 2 accessible Jack and Jill suites with roll-in showers, 1 accessible Jack and Jill suite with a transfer shower, 1 single accessible room with attached bathroom with a roll-in shower, and 1 single accessible room with attached bathroom with a transfer shower on Level 1 at the North Tower. This project consists of the following: Demolition of flooring, walls, plumbing fixtures, wall and floor tile, doors, built-in furniture, and ceilings of 9 rooms and 5 bathrooms on Level 1 as well as doors at Rooms 158 and 160, where walls within suite were previously demolished to become fully ADA/TAS compliant accessible rooms and suites as described above. New work to include new walls, doors, plumbing re-build to tie into new chase walls, plumbing fixtures, and toilet accessories at new accessible suites as described above.
All 32 rooms in scope to receive new flooring, base, paint, HVAC pony wall surround, sink and faucet in cabinet, tackboards, paint, and drywall where indicated. Power is existing and will be connected to new devices within 6’ of original location. New Lounge at North Tower Entry will be incorporated, capturing demolished resident room 152 to provide an accessible route from ground level to Level 1 resident rooms with the incorporation of a pit-free, ramp-free, electric chair lift.
A small slab addition will be incorporated to infill a small area adjacent to the new chair lift location for acontinuous floor at the new Lounge 152.
The project includes the demolition of flooring, walls, plumbing fixtures, wall and floor tile, doors, built-in furniture, and ceilings of 9 rooms and 5 bathrooms on Level 1, as well as doors at Rooms 158 and 160. New work includes new walls, doors, plumbing re-build to tie into new chase walls, plumbing fixtures, and toilet accessories at new accessible suites. All 32 rooms in scope will receive new flooring, base, paint, HVAC pony wall surround, sink and faucet in cabinet, tackboards, paint, and drywall where indicated. A new Lounge at North Tower Entry will be incorporated, capturing demolished resident room 152 to provide an accessible route from ground level to Level 1 resident rooms with the incorporation of a pit-free, ramp-free, electric chair lift. A small slab addition will be incorporated to infill a small area adjacent to the new chair lift location for a continuous floor at the new Lounge 152.
We post new general contractors opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Texas SmartBuy (ESBD) (solicitation 27CSP001), retrieved via the Texas Comptroller Electronic State Business Daily. View the official posting, and always confirm requirements and deadlines with the issuing agency.