The Roof Removal & Replacement at Board of Education RFB # 2
The work includes a full roof tear-off of the existing aggregate surfaced BUR system down to the metal deck, removal of flashings and counterflashings, and installation of a new cold-applied built-up asphalt roofing system. The new system includes a base sheet, roof insulation, cover board, roofing membrane ply sheets, base flashings, and aggregate surfacing. The project also involves sheet metal flashing and trim, temporary roofing and drainage, and the removal and reinstallation of rooftop equipment. The roof area is approximately 40,883 square feet.
We post new roofing opportunities in Michigan as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Michigan SIGMA VSS (solicitation RFP-TAY-270000000121-1), retrieved via the Michigan SIGMA Vendor Self Service portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.