Provide Labor & Materials to replace existing fire tube heating boilers, piping and electrical connections as defined in the drawing including demolition, disposal, and controls. Bidders shall submit bids in accordance with Hand-Delivery or Mail Service only.
Delivery Method: Design-Bid-Build
Construction Cost Range: $230,000.00 - $310,000.00 Prime Contractor License (Special Standard of Responsibility): BL2, HT4
Documents: http://supplier.ps.sc.edu
Provide Labor & Materials to replace existing fire tube heating boilers, piping and electrical connections as defined in the drawing including demolition, disposal, and controls.