Demolish and replace the 4000A, 208V switchgear and replace with new. Demolish and replace multiple panels and miscellaneous apparatus on multiple building levels per GWA design drawings
Delivery Method: Design-Bid-Build
Construction Cost Range: 1.5M to 2.2M
Documents: Clemson University Facilities Website