The scope includes main electrical system upgrades to add capacity to the 1951 infrastructure by replacing the main distribution, switchboards, panels, meters, and wiring. Work also includes the demolition of two existing elevators and the installation of a single, modern passenger elevator. Provide a (3) year warranty from date of Certificate of Operation covering parts, labor, callbacks (24/7), and code-required testing.
Delivery Method: Design-Bid-Build
Construction Cost Range: $1,250,000 to $1,750,000 Prime Contractor License (Special Standard of Responsibility): General Contractor with a Building (BD) classification, Group 4 or Group 5 dollar limitation.
Documents: CEMS Engineering Inc. via Duncan Parnell
The scope includes main electrical system upgrades to add capacity to the 1951 infrastructure by replacing the main distribution, switchboards, panels, meters, and wiring. Work also includes the demolition of two existing elevators and the installation of a single, modern passenger elevator.
We post new electrical opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: The Citadel (solicitation H09-9628-CB), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.