The project will consist of full depth patching, leveling, variable milling and overlaying, shoulder widening, and pavement marking of approximately 36,770 LF of existing roadway at the following: Bloomsbury Circle (Local), Cambridge Lane Extension (Local), S-499 (Catoe Road), Clyburn Lane Extension (Local), S-68 (College Street W), S-65 (Fair Street E), S-306 (Hall Road), S-944 (Hunters Point Drive), John Eddye Road (Local), Little Street (Local), S-144 (Norwood Street E), Ole Still Lane (Local
Delivery Method: Other
Documents: www.kershaw.sc.gov
The project will consist of full depth patching, leveling, variable milling and overlaying, shoulder widening, and pavement marking of approximately 36,770 LF of existing roadway at the following: Bloomsbury Circle (Local), Cambridge Lane Extension (Local), S-499 (Catoe Road), Clyburn Lane Extension (Local), S-68 (College Street W), S-65 (Fair Street E), S-306 (Hall Road), S-944 (Hunters Point Drive), John Eddye Road (Local), Little Street (Local), S-144 (Norwood Street E), Ole Still Lane (Local), Sheffield Drive (Local), Spring Village Road (Local), Woodland Drive (Local).
We post new asphalt opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most South Carolina work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: Kershaw County (solicitation Bid-26-205-06), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.