- Items
- MOBILIZATION 1.000 LS, BONDS AND INSURANCE 1.000 LS, CONSTRUCTION STAKES, LINES & GRADES 1.000 EA, CPM PROGRESS SCHEDULE 1.000 LS, REMOVAL & DISPOSAL OF EXISTING PAVEMENT 300.000 SY, REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 355.000 SY, SITE EXCAVATION 1.000 LS, MAINTENANCE STONE 100.000 TON, LIQUID ASPHALT BINDER PG64-22 53.000 TON, MILLING EXISTING ASPHALT PAVEMENT 2.0" 7,850.000 SY, ASPHALT BASE COURSE - TYPE B 50.000 TON, ASPHALT INTERMEDIATE COURSE TYPE B 25.000 TON, ASPHALT SURFACE COURSE TYPE B 900.000 TON, TRAFFIC CONTROL 1.000 LS, PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 380.000 SF, 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 2,000.000 LF, 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 1,300.000 LF, 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 7,400.000 LF, 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 4,800.000 LF, WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 2.000 EA, WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 38.000 EA, WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 40.000 EA, 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 1,320.000 LF, 6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 38,500.000 LF, 24" YELLOW DIAGONAL LINES - FAST DRY PAINT 300.000 LF, 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 1,000.000 LF, 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 650.000 LF, 8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 3,700.000 LF, 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 2,400.000 LF, WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 1.000 EA, WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 19.000 EA, WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL 20.000 EA, 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 2,360.000 LF, 24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 480.000 LF, PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 55.000 EA, PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 280.000 EA, REMOVAL OF PAVEMENT MARKINGS 2,800.000 LF, REMOVAL OF EXISTING ARROW, WORD MESSAGE & SYMBOL MARKINGS 8.000 EA, FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN 36.500 SF, FLAT SHEET, TYPE XI, SIZE DETERMINED BY MSG, OVERHEAD 165.000 SF, MOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON SPAN WIRE 22.000 EA, U-SECTION POST FOR SIGN SUPPORTS - 3P 94.000 LF, FURNISH & INSTALL 3.0" GALVANIZED RIGID CONDUIT 160.000 LF, FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 375.000 LF, FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 440.000 LF, FURNISH & INSTALL 3.0" SCHEDULE 80 PVC CONDUIT 70.000 LF, FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - BLACK 1,710.000 LF, FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - GRAY 1,710.000 LF, FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (BLACK) 5,880.000 LF, FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (GRAY) 2,410.000 LF, FURNISH & INSTALL ELECTRICAL SERVICE FOR TRAFFIC SIGNAL 3.000 EA, F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 9.000 EA, F&I-17"X30"X24"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 3.000 EA, FURNISH & INSTALL 13" X 32' STEEL STRAIN POLE AND FOUNDATION 8.000 EA, FURNISH & INSTALL 3/8" GALVANIZED STEEL CABLE 1,845.000 LF, FURNISH & INSTALL 10' BREAK-AWAY ALUM PEDESTAL POLE AND BASE 13.000 EA, F&I - CONTR 332/336 CABINET ASSEMBLY - BASE MOUNTED 01 3.000 EA, FURNISH & INSTALL -12" 4 SECTION SIGNAL HEAD 1.000 EA, FURNISH & INSTALL - 12" 3 SECTION SIGNAL HEAD 01 37.000 EA, F&I - 1-WAY-1SECT.HAND/MAN COUNTDOWN PEDESTRIAN SIGNAL HEAD 24.000 EA, BACKPLATE W/ RETROREFL.BORDERS FOR TRAFF. SIG. 38.000 EA, REMOVAL,SALVAGE,&DISP.OF EXISTING TRAF. SIGNAL EQUIPMENT 1.000 LS, F&I - VIDEO DETECTION SYSTEM W/ ONE CAMERA, HARDWARE & LEAD-IN 3.000 EA, FURNISH & INSTALL VIDEO DETECTION CAMERA W/ HARDWARE & LEAD-IN 6.000 EA, REMOVE FOUNDATION FOR STEEL STRAIN POLE - 18" BELOW GRADE 8.000 EA, FURNISH & INSTALL CONCRETE CABINET FOUNDATION 3.000 EA, FURNISH & INSTALL FACTORY TERMINATED PATCH PANEL 3.000 EA, 12" SMOOTH WALL PIPE 16.000 LF, 15" SMOOTH WALL PIPE 272.000 LF, 18" SMOOTH WALL PIPE 32.000 LF, CATCH BASIN -TYPE 1 CB - TYPE 1 1.000 EA, CATCH BASIN -TYPE 9 MH 2.000 EA, CATCH BASIN -TYPE 16 1.000 EA, 24" X 24" JUNCTION BOX 1.000 EA, CATCH BASIN - TYPE 17 (TOP ONLY) 5.000 EA, JUNCTION BOX - CONVERT CB T-16 2.000 EA, 4' SLOPE FLUME (6" CURB STYLE WITH CUTOFFS) 10.000 LF, CONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE 1,100.000 LF, CONCRETE SIDEWALK(4" UNIFORM) 3,220.000 SY, CONCRETE SIDEWALK(6" UNIFORM) 325.000 SY, DETECTABLE WARNING MATERIAL 480.000 SF, CONCRETE DRIVEWAY(6" UNIFORM) 180.000 SY, CONCRETE MEDIAN 3,000.000 SY, PEDESTRIAN RAMP CONSTRUCTION 700.000 SY, RIP-RAP (CLASS B) 10.000 TON, GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE C 12.000 SY, PERMANENT GRASSING FOR SMALL PROJECTS 1.700 ACRE, TURF REINFORCEMENT MATTING (TRM) TYPE 2 1.030 MSY, TEMPORARY EROSION CONTROL BLANKET (ECB) 9.810 MSY, INLET STRUCTURE FILTER - TYPE F (WEIGHTED) 32.000 LF, INLET STRUCTURE FILTER- TYPE F (NON-WEIGHTED) 33.000 LF, SEDIMENT TUBES FOR DITCH CHECKS 20.000 LF, SILT FENCE 2,850.000 LF, REPLACE/REPAIR SILT FENCE 285.000 LF, REMOVAL OF SILT RETAINED BY SILT FENCE 712.500 LF, STABILIZED CONSTRUCTION ENTRANCE 550.000 SY
- Call No
- 090
- File No
- 2375450
- Dbe Goal
- 0.00%
- Funding
- FED
- Counties
- Greenville
- Project No
- P041909
- Letting Date
- 11/10/2026
- Letting Time
- 2:00 pm
- Notice Title
- 11102026 Proposal 5177470 - NTC 60 DAY AD
- Approx Length
- 0.8910
- Available Date
- Nov 6, 2026
- Categorized By
- llm
- Detail Fetched
- Yes
- Completion Date
- 7/31/2028