Planned improvements shall include preliminary treatment building upgrades (mechanical screen replacement, grit equipment replacement, and HVAC improvements), primary clarifiers replacement, new primary sludge pumping station, new intermediate lift station, aeration tank rehabilitation and proces
Place of Performance: Iowa
Performance Start: 12/1/2026
Planned improvements shall include preliminary treatment building upgrades (mechanical screen replacement, grit equipment replacement, and HVAC improvements), primary clarifiers replacement, new primary sludge pumping station, new intermediate lift station, aeration tank rehabilitation and process improvements (conversion to three-stage), aeration blower replacement in a new secondary control building, replacement of existing final clarifier 1-4 mechanisms and structural rehabilitation and handrail replacement, new final clarifier construction, RAS pump station replacement in a new secondary control building, rehab of one anaerobic digester for conversion to sludge storage, plant wide odor control to address odors from the headworks, primary clarifiers, intermediate lift station, and solids dewatering areas, new plantwide standby emergency power generator(s), new WWTP main switchgear replacement, new WWTP SCADA system upgrades, code related improvements for NFPA 820 and other safety related standards, demolition of unused WWTP structures and buildings (north primary clarifiers and associated pump houses, south primary clarifiers and associated pump houses, south headworks building and grit detritor system, gas conditioning building, pipe valve vault building, garage #1, garage #2, and storage building adjacent to the chlorine contact tanks) and related HVAC, plumbing, electrical, instrumentation, and site/civil improvements. Scopes of Work and Materials Requested include but are not limited to: Hazardous material abatement, concrete work, masonry, miscellaneous metals, rough carpentry, glass fiber & resin fabrications, thermal & moisture protection, openings, finishes, identifying devices, toilet & batch accessories, fire extinguishers, aluminum flat covers, plumbing, HVAC, electrical, fire detection & alarm systems, earthwork, utilities, process interconnections, cranes & hoists, high pressure wash systems, process gas & liquid handling, purification, & storage equipment, odor control systems, and water & wastewater equipment.
Most Iowa work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Rice Lake Construction Group (SUBNet), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.