Steve Manning Construction, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified SB, SDB, HUBZone, WOSB, VOSB and SDVOSB firms.
Place of Performance: North Dakota
Performance Start: 4/30/2027
The work includes mobilization, survey and staking, grade finishing, contractor quality control, testing, construction schedule, soil erosion control, SWPPP, watering for dust control, removal of various items (bollard, catch basin, monument, pipe culvert, sign, trash receptacle, curb and gutter concrete, curb asphalt, guardrail, paved waterway and sidewalk), placed riprap, revetment mat, roadway aggregate full depth reclamation, asphalt concrete pavement, fog seal, prime coat, blotter, tack coat, minor concrete pavement, concrete, pipe culvert, end section pipe culvert, catch basin, metal frame and grate, pipe anchor assembly, paved waterway, curb asphalt, curb and gutter concrete, paved ditch asphalt, sidewalk concrete, accessibility ramp concrete, guardrail system, terminal section, special labor hired technical services (paleontologist monitor), hydraulic seeding, hydraulic mulching, rolled erosion control product, sign system, delineator type flexible, pavement markings, temporary traffic control, field office, fixture trash receptacle, and fixture bench.
We post new asphalt opportunities in North Dakota as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most North Dakota work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Steve Manning Construction Inc. (SUBNet), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.