We'll email you new asphalt opportunities in Rhode Island as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
The scope of work included in Rhode Island Contract (RIC) No. 2026-CB-046, RI
Federal Aid Project No. (405-422-243), is for the steel beam end repairs and asphaltic joint
replacement. The bridges are as follows:
• Bridge No. 086501 – Francis Street North, Providence
• Bridge No. 063401 – Jefferson Boulevard, Warwick
• Bridge No. 074101 – Putnam Pike, Smithfield
• Bridge No. 092801 – Smith Street Railroad Bridge, Providence
• Bridge No. 064401 – Sprague Street Bridge, Portsmouth
• Bridge No. 076801 – Stony Lane Bridge, North Kingstown
• Bridge No. 055201 – Water Street Bridge, Pawtucket
The scope of work included in Rhode Island Contract (RIC) No. 2026-CB-046, RI Federal Aid Project No. (405-422-243), is for the steel beam end repairs and asphaltic joint replacement. The bridges are as follows: Bridge No. 086501 – Francis Street North, Providence; Bridge No. 063401 – Jefferson Boulevard, Warwick; Bridge No. 074101 – Putnam Pike, Smithfield; Bridge No. 092801 – Smith Street Railroad Bridge, Providence; Bridge No. 064401 – Sprague Street Bridge, Portsmouth; Bridge No. 076801 – Stony Lane Bridge, North Kingstown; Bridge No. 055201 – Water Street Bridge, Pawtucket. Line items include temporary deck protective shielding, asphaltic expansion joint system, crack repairs, steel repairs (in pounds), reset existing sole plate, painting existing structural steel, surface preparation for existing steel, containment/collection/storage/disposal of debris and spent materials, mobilization, force account bank for unexpected Amtrak downtime, and furnish/install/maintain/move temporary traffic protection.
"Y""MBE_Participation_Forms.pdf"1790169837000179016983700019617121790169837000"Y"1120002769655"application/pdf"1961712"ORG""MBE_Participation_Forms.pdf""Y""2026-CB-046 - JS Pages.pdf"1790177524000179017752400019618241790177524000"Y"1120002328471"application/pdf"1961824"ORG""2026-CB-046 - JS Pages.pdf""Y""Federal Wage Rates 7-30-2026.pdf"1790169837000179016983700019617111790169837000"Y"112000257037"application/pdf"1961711"ORG""Federal Wage Rates 7-30-2026.pdf""Y""RIDOT_Required_Forms_State_Funded.pdf"1790169839000179016983900019617131790169839000"Y"1120002982087"application/pdf"1961713"ORG""RIDOT_Required_Forms_State_Funded.pdf""Y""2026-CB-046 - Additional Information - Existing Plans.pdf"1790169863000179016986300019617141790169863000"Y"1120002475212702"application/pdf"1961714"ORG""2026-CB-046 - Additional Information - Existing Plans.pdf""Y""2026_August_Standard_Specifications.zip"1790169734000179016973400019617081790169734000"Y"1120002130075836"application/zip"1961708"ORG""2026_August_Standard_Specifications.zip""Y""2026-CB-046 - Plans.pdf"1790191808000179019180800019622091790191808000"Y"11200027500384"application/pdf"1962209"ORG""2026-CB-046 - Plans.pdf""N""Lynch-Corporate Officers-10.20.23.pdf REV 15JAN25.pdf w Percentages.pdf"1790609698000179060969800019642281790609698000"Y"114644161383"application/pdf"1964228"ORG""Lynch-Corporate Officers-10.20.23.pdf REV 15JAN25.pdf w Percentages.pdf""Y""2026-CB-046 - CS Pages.pdf"1790170185000179017018500019617151790170185000"Y"112000214564471"application/pdf"1961715"ORG""2026-CB-046 - CS Pages.pdf""Y""2026-CB-046 - DOQ Backup.pdf"1790178269000179017826900019618271790178269000"Y"1120002456302"application/pdf"1961827"ORG""2026-CB-046 - DOQ Backup.pdf"2151040{"name":"lump sum","unit":860,"abbrev":"LS"}"824.9906"019"N""N"019114482082682911324811305732151156{"name":"each","unit":19,"abbrev":"EA"}"936.9901"019"N""N"0191000014482082682911326191305732151154{"name":"square foot","unit":74,"abbrev":"FTK"}"803.0500"019"Y""Y"01960014482082682911324691305732151036{"name":"pound","unit":50,"abbrev":"LBR"}"824.9902"019"N""N"019813814482082682911324771305732151037{"name":"pound","unit":50,"abbrev":"LBR"}"824.9903"019"N""N"019104414482082682911324781305732151038{"name":"pound","unit":50,"abbrev":"LBR"}"824.9904"019"N""N"019456514482082682911324791305732151327{"name":"square foot","unit":74,"abbrev":"FTK"}"825.8050"019"Y""Y"019259214482082682911327891305732151035{"name":"lump sum","unit":860,"abbrev":"LS"}"824.9901"019"N""N"019114482082682911324761305731754810{"name":"lump sum","unit":860,"abbrev":"LS"}"937.0100"0860"Y""Y"0860114482082682911324871305732151039{"name":"pound","unit":50,"abbrev":"LBR"}"824.9905"019"N""N"019256614482082682911324801305731911245{"name":"linear foot","unit":34,"abbrev":"LF"}"823.1750"019"Y""Y"01921714482082682911324821305732151326{"name":"square foot","unit":74,"abbrev":"FTK"}"825.8040"019"Y""Y"019390614482082682911327881305731748307{"name":"lump sum","unit":860,"abbrev":"LS"}"936.0110"0860"Y""Y"0860114482082682911324861305731723257{"name":"lump sum","unit":860,"abbrev":"LS"}"826.0100"0860"N""N"0860114482082682911324851305731120002111200025Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: State of Rhode Island (bid 144820), retrieved via the Rhode Island WebProcure bid board. View the official posting, and always confirm requirements and deadlines with the issuing agency.