Read this notice and pull out the scope, the deadlines and what you have to submit.
This project consists of a bridge preservation to the SR 3036, Section 005 (Franklin Road) bridge over Strickler Run, bridge rehabilitation to the SR 4008-034 (Elizabethtown Road) bridge over Brubaker Run, and a bridge replacement of the SR 4033, Section 008 (Milton Grove Road) bridge over Back Run and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 3036, SECTION 005, in LANCASTER COUNTY, WEST HEMPFIELD TOWNSHIP, from Segment 0030 Offset 0737 to Segment 0030 Offset 1276, for a length of 339.00 linear feet (0.064 mile), and for STATE ROUTE 4008, SECTION 034, in LANCASTER COUNTY, RAPHO TOWNSHIP, from Segment 0290 Offset 0158 to Segment 0290 Offset 0858, for a length of 500.00 linear feet (0.095 mile), and for STATE ROUTE 4033, SECTION 008, in LANCASTER COUNTY, RAPHO TOWNSHIP, from Segment 0030 Offset 1421 to Segment 0040 Offset 0300, for a length of 690.00 linear feet (0.131 mile).
Additional Information: This is an ECMS project. All Addenda will be electronically posted. The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to contact Contract Awards and be escorted to the 7th Floor Contract Awards Room. Contract Awards can be reached at 717-395-9754. Due to recent changes in the Keystone Building, there is no longer a reception on the 5th Floor to greet and check-in visitors.
We post new structural work opportunities in Pennsylvania as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Pennsylvania work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: Pennsylvania Department of Transportation (PennDOT) (solicitation PENNDOT_101290_1), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.