Kirk Road Over LWDD L-11 Canal - Culvert Replacement
Engineer's Estimate: $1,300,000
The work consists of the removal of the existing 60" culvert pipe under Kirk Road and concrete endwalls, and replacement with a new 6'x10' box culvert with concrete wingwalls and endwalls. The work includes canal reshaping to the LWDD Canal Design Section, water main relocation, roadway reconstruction, signing and pavement marking, and related utility work such as fire hydrant assembly, gate valves, and ductile iron fittings. The project also includes mobilization, maintenance of traffic, clearing and grubbing, excavation, embankment, base stabilization, asphalt paving, concrete work, guardrail installation, and sodding.
Source: Engineering and Public Works (solicitation IFB-360-2023502-2), retrieved via a public procurement portal. View the official posting , always confirm requirements and deadlines with the issuing agency.