A1A, US 1 to Donald Ross Rd
Engineer's Estimate $1,500,000
The work includes installation of 2714 LF of drainage pipe system, and one system outfall to Pelican Lake. The project involves constructing various drainage structures such as inlets and manholes, installing concrete pipe culverts of 18", 24", and 30" diameters, and performing related work like desilting, swale excavation, and retaining wall repair. Roadway items include 1 1/2" asphalt concrete friction course, concrete curb and gutter, concrete sidewalk, and sod. The project also includes the construction of North and South Littoral Shelves with fill and wetland plantings. The contract is a unit price contract.
Source: Engineering and Public Works (solicitation IFB-360-2019805-2), retrieved via a public procurement portal. View the official posting , always confirm requirements and deadlines with the issuing agency.