Lyons RD N of L30 Canal to Boynton Bch Blvd
Engineer's Estimate $15,800,000
The project includes roadway drainage structures, box culvert extension, cross sections, and signalization plans. Signalization work involves installing mast arm assemblies, pedestrian signals, loop detectors, pull boxes, conduit, electrical power service, and removing existing signal equipment. The contractor must adhere to Palm Beach County Traffic Signal Installation Standards and FDOT Roadway Design Standards, coordinate with PBC Traffic Division, and maintain existing signal operations during construction.
We post new asphalt opportunities in Florida as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Florida work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: Engineering and Public Works (solicitation IFB-360-2018503_2020110REBID-3), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.