LNA Southside Redevelopment Program Phase 3
The work generally consists of: The expansion of the existing airfield electrical vault by approximately 2,500 square feet and includes interior renovation of the existing structure and replacement of the existing roof. The work includes modifications to the existing HVAC system and Fire Protection system. The expansion increases the vault electrical capacity also includes the relocation of the existing regulators, ALCMS control system, fiber optic cable power and communication wiring. Replacement of the standby emergency power generator is included as an additive alternate bid item.
The work includes development of Phase 3 at Palm Beach County Park Airport including reconfiguring the central access road and parking area with 75 spaces, reconfiguring stormwater collection with 60-inch RCP trunkline and exfiltration trench and filling the existing pond, replacing the sanitary lift station with new gravity sewer, force main and 10-inch watermain, reconfiguring electrical and utility infrastructure including repowering buildings, parking lighting, gate power and communication duct bank, demolition of buildings, pavement and trees, site security with AOA fencing and electronic gates, and new landscaping and irrigation. The Invitation also describes expansion of the existing airfield electrical vault by approximately 2,500 square feet with interior renovation, roof replacement, HVAC and fire protection modifications, increased electrical capacity, relocation of regulators, ALCMS, fiber optic and communication wiring, with standby generator replacement as an additive alternate.
We post new general contractors opportunities in Florida as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Airports (solicitation IFB-120-LN 26-13-6), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.