Cascade Locks Fire Station Solar Plus Storage Microgrid Design/Build Services
The scope includes engineering, procurement, and construction of a turn-key microgrid system. The proposer shall install a solar PV system (minimum 64 kW DC / 51 kW AC), a battery energy storage system (approximately 125 kW / 110 kWh), microgrid controls and DER integration, complete electrical infrastructure reconfiguration and upgrades, and interconnect, test, permit, and commission the microgrid. The system must support automatic islanding during grid outages and provide power to the grid under normal conditions. The proposer must also provide warranties, performance guarantees, and training.
We post new professional & consulting services opportunities in Oregon as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: OregonBuys (bid S-X33157-00017870), retrieved via the OregonBuys statewide open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.