- Scope
- This interchange reconstruction project is the second phase of a project to increase safety and mobility on NYS Route 17 in proximity to the interchange with Crystal Run Road, East Main Street. The project will complete the reconstruction of the Exit 122 interchange to meet interstate standards for design, as the entirety of Route 17 is designated to be converted to Interstate 86. Work includes new ramps on the Westbound side of Route 17 to Crystal Run Road and to Interstate 84 Eastbound, and to improve the ramp from Crystal Run Road to Route 17 Eastbound. Work will also include pedestrian improvements including a shared use path along Crystal run road, the widening of the NY Route 17 over the Wallkill River bridge, and signal improvements where necessary. This project is located in the Town of Wallkill in Orange County.
- Region
- HUDSON VALLEY
- Address
- Hudson Valley Region — Orange County — NY
- Due Date
- Feb 24, 2025
- Funding
- Local
- No
- State
- Yes
- Federal
- Yes
- Mpo Text
- Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project
in New York State for which Federal funding is proposed to be used and that is
scheduled to begin during the designated three Federal fiscal year time frame.
To review the STIP Project List by Region please see the
STIP Project Report .
- Award Raw
- 02/24/2025
- Counties
- Orange
- Overview
- Project Overview
Project Status
- The current status of the project is Under Construction.
- The Bid Opening was on 12/19/2024.
Project Schedule
Award of Contract Original Contract Completion Date*
Estimated Substantial Completion Date*
Construction Schedule Variance from Contract Award** Award of Contract Original Contract Completion Date*
Estimated Substantial Completion Date*
Construction Schedule Variance from Contract Award**
02/24/2025
12/20/2026
11/20/2026
On-Time (Green)
** Schedule Variance Key:
Red - Current Schedule Variance is > 10% of Original Completion Yellow - Current Schedule Variance is > 5% and Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract* Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$67,841,000
$1,041,371
$68,882,371
On-Budget (Green)
**Cost Variance Key:
Red - Current Construction Costs are > 10% of Contract Award Cost Yellow - Current Construction Costs > 5% and Green - Current Construction Costs are within 5% of Contract Award Cost
Project Schedule Defintions:
Original Contract Completion Date - This is a contractual date, at the time the Contractor is Awarded the contract,representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No
- Status Text
- Under Construction
- Contact Name
- Heather Pillsworth
- Contact Text
- Contact Us
If you have questions please contact:
Heather Pillsworth, PIN-806510
NYSDOT Region 8 Public Information Officer
4 Burnett Boulevard
Phone: 845-431-7911
- Description
- ## Project Overview
Project Status
- The current status of the project is Under Construction.
- The Bid Opening was on 12/19/2024.
Project Schedule
Award of Contract Original Contract Completion Date*
Estimated Substantial Completion Date*
Construction Schedule Variance from Contract Award** Award of Contract Original Contract Completion Date*
Estimated Substantial Completion Date*
Construction Schedule Variance from Contract Award**
02/24/2025
12/20/2026
11/20/2026
On-Time (Green)
** Schedule Variance Key:
Red - Current Schedule Variance is > 10% of Original Completion Yellow - Current Schedule Variance is > 5% and Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract* Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$67,841,000
$1,041,371
$68,882,371
On-Budget (Green)
**Cost Variance Key:
Red - Current Construction Costs are > 10% of Contract Award Cost Yellow - Current Construction Costs > 5% and Green - Current Construction Costs are within 5% of Contract Award Cost
Project Schedule Defintions:
Original Contract Completion Date - This is a contractual date, at the time the Contractor is Awarded the contract,representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No
## Description
This interchange reconstruction project is the second phase of a project to increase safety and mobility on NYS Route 17 in proximity to the interchange with Crystal Run Road, East Main Street. The project will complete the reconstruction of the Exit 122 interchange to meet interstate standards for design, as the entirety of Route 17 is designated to be converted to Interstate 86. Work includes new ramps on the Westbound side of Route 17 to Crystal Run Road and to Interstate 84 Eastbound, and to improve the ramp from Crystal Run Road to Route 17 Eastbound. Work will also include pedestrian improvements including a shared use path along Crystal run road, the widening of the NY Route 17 over the Wallkill River bridge, and signal improvements where necessary. This project is located in the Town of Wallkill in Orange County.
## Location
This project is located in the **Hudson Valley** region.
**Counties:** Orange

- Contact Email
- R8Projects@dot.state.ny.us
- Contact Phone
- 845-431-7911
- Location Text
- This project is located in the HUDSON VALLEY region and includes the following:
Counties
ORANGE
- Bid Opening Raw
- 12/19/2024
- Bid Opening Date
- Dec 19, 2024
- Legislative Text
- Legislative Districts
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
18th Congressional District (Patrick Ryan)
State Senatorial District(s)
42nd Senatorial District (James Skoufis)
State Assembly District(s)
100th Assembly District (Paula Elaine Kay)