- Scope
- This project will perform minor bridge/culvert maintenance at locations to be determined by the Regional Bridge Maintenance Engineer. Locations will include all counties in Region 7.
- Region
- NORTH COUNTRY
- Address
- North Country Region — Franklin, St Lawrence, Clinton, Jefferson County — NY
- Due Date
- May 1, 2025
- Funding
- Local
- No
- State
- Yes
- Federal
- No
- Mpo Text
- Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project
in New York State for which Federal funding is proposed to be used and that is
scheduled to begin during the designated three Federal fiscal year time frame.
To review the STIP Project List by Region please see the
STIP Project Report .
- Award Raw
- 05/01/2025
- Counties
- Franklin, St Lawrence, Clinton, Jefferson
- Overview
- Project Overview
Project Status
- The current status of the project is Under Construction.
- The Bid Opening was on 03/20/2025.
Project Schedule
Award of Contract Original Contract Completion Date*
Estimated Substantial Completion Date*
Construction Schedule Variance from Contract Award** Award of Contract Original Contract Completion Date*
Estimated Substantial Completion Date*
Construction Schedule Variance from Contract Award**
05/01/2025
04/30/2027
03/31/2027
On-Time (Green)
** Schedule Variance Key:
Red - Current Schedule Variance is > 10% of Original Completion Yellow - Current Schedule Variance is > 5% and Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract* Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$1,929,935
$1,849,216
$3,779,151
Red
**Cost Variance Key:
Red - Current Construction Costs are > 10% of Contract Award Cost Yellow - Current Construction Costs > 5% and Green - Current Construction Costs are within 5% of Contract Award Cost
Project Schedule Defintions:
Original Contract Completion Date - This is a contractual date, at the time the Contractor is Awarded the contract,representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
This project receives funding from the following sources:
Federal: No
State : Yes
Local : No
- Status Text
- Under Construction
- Contact Name
- Jarrod Radley
- Contact Text
- Contact Us
If you have questions please contact:
Jarrod Radley, PIN-780751
NYSDOT Region 7 Public Information Officer
317 Washington Street
Watertown, NY 13601
Phone: 315-785-2218
- Description
- ## Project Overview
Project Status
- The current status of the project is Under Construction.
- The Bid Opening was on 03/20/2025.
Project Schedule
Award of Contract Original Contract Completion Date*
Estimated Substantial Completion Date*
Construction Schedule Variance from Contract Award** Award of Contract Original Contract Completion Date*
Estimated Substantial Completion Date*
Construction Schedule Variance from Contract Award**
05/01/2025
04/30/2027
03/31/2027
On-Time (Green)
** Schedule Variance Key:
Red - Current Schedule Variance is > 10% of Original Completion Yellow - Current Schedule Variance is > 5% and Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract* Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$1,929,935
$1,849,216
$3,779,151
Red
**Cost Variance Key:
Red - Current Construction Costs are > 10% of Contract Award Cost Yellow - Current Construction Costs > 5% and Green - Current Construction Costs are within 5% of Contract Award Cost
Project Schedule Defintions:
Original Contract Completion Date - This is a contractual date, at the time the Contractor is Awarded the contract,representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
This project receives funding from the following sources:
Federal: No
State : Yes
Local : No
## Description
This project will perform minor bridge/culvert maintenance at locations to be determined by the Regional Bridge Maintenance Engineer. Locations will include all counties in Region 7.
## Location
This project is located in the **North Country** region.
**Counties:** Franklin, St Lawrence, Clinton, Jefferson

- Contact Email
- R7Projects@dot.state.ny.us
- Contact Phone
- 315-785-2218
- Location Text
- This project is located in the NORTH COUNTRY region and includes the following:
Counties
FRANKLIN
ST LAWRENCE
CLINTON
JEFFERSON
- Bid Opening Raw
- 03/20/2025
- Bid Opening Date
- Mar 20, 2025
- Legislative Text
- Legislative Districts
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
21st Congressional District (Elise Stefanik)
24th Congressional District (Claudia Tenney)
State Senatorial District(s)
45th Senatorial District (Daniel G. Stec)
49th Senatorial District (Mark Walczyk)
State Assembly District(s)
115th Assembly District (Michael Cashman)
116th Assembly District (Scott Gray)
117th Assembly District (Ken Blankenbush)
120th Assembly District (William A. Barclay)