Light RFP
NY State Contract Reporter · Queens

CUNY Queens College Remsen Hall - Food Science Lab Renovation & Associated Hazmat Removal (EOI)

Due Aug 13, 2026·15 days left·Renovation, General ConstructionView official posting ↗
Issuing agency
Dormitory Authority of the State of New York — Construction
Method
General
Category
Construction Vertical: Building Construction; Rehabilitation & New Construction
PIN
2137144
Location
Queens
Posted
Jul 16, 2026
Takeaways by LightRFP AI
  • This is an Expression of Interest (EOI) for the renovation of the Food Science Lab on the 3rd floor of Remsen Hall at CUNY Queens College, including associated hazardous materials removal.
  • The estimated cost range for the scope of work is $6,500,000 - $7,000,000.
  • The EOI due date is 2026-08-13, and the posted date is 2026-07-16.
  • The issuing agency is the Dormitory Authority of the State of New York — Construction.
  • The place of performance is Queens.
  • Requirement: Firms must provide documentation showing a minimum of five (5) years of experience with projects similar in size, scope, and complexity to the one being proposed.
  • Requirement: MBE Goal: 18.00%
  • Requirement: WBE Goal: 12.00%
  • Requirement: SDVOB Goal: 6.00%
  • Requirement: Firms shall provide a signed letter from a Surety Company attesting to your firm’s single, aggregate and available bonding capacity.

AI-generated, verify all details against the official documents.

Description

THIS SOLICITATION IS FOR EXPRESSIONS OF INTEREST (EOI) ONLY

See the Eligibility Requirements further down in this document.

This existing laboratory space is over 40 years old and is not compliant with building, fire, life and safety codes for the safe food handling of food. This comprehensive renovation supports academic programs in food science, nutrition, dietetics, and consumer sciences, and will result in modernized, code-compliant, high-efficiency lab environments.

The scope of work for the Remsen Hall Food Science Lab renovation encompasses a comprehensive interior systems overhaul on the 3rd floor of Remsen Hall, specifically targeting Rooms 300 (Multipurpose), 300A-G (subspaces including pantry, storage, laundry), Room 30 l (Food Science Lab), and Room 302 (Swing Space). The project includes demolition of existing finishes, casework, and equipment, followed by installation of new floor, ceiling, and wall finishes, lab casework, food science equipment, AV systems, and compliant kitchen hoods with ANSUL fire suppression systems. New MEP systems will include three new rooftop units (RTUs) providing dedicated ventilation, cooling, and heating through steam coils for each zone (Rooms 300, 301, and 302), as well as new ductwork and exhaust systems for kitchen and laundry operations. Electrical upgrades will include new LED lighting to meet ASHRAE 90.1, new 600A distribution and 200A branch panels in Room 300C, and dedicated circuits with GFCI protection for over 25 kitchen appliances. Plumbing upgrades entail new water, gas, and sanitary connections for all rooms with fixtures (including floor drains, grease interceptors, and sediment traps). The work includes penetrations and equipment installation on the roof with curbs, waterproofing, and code-compliant fire alarm integration. Quantities include at least 13 lab workstations (across Rooms 301 and 302), over 20 appliances, 3 rooftop HVAC units, 3 new panels, and extensive interior renovation totaling over 4,500 sq. ft. of instructional and lab space.


Estimated Cost Range for Scope of Work: $6,500,000 - $7,000,000.


Project Labor Agreement

**The successful low bidder as a condition of being awarded this Contract, must execute the PLA included in the Contract Documents following the Form of Bid. The Work undertaken in connection with this Project will be governed by, and subject to the conditions set forth in the PLA. All Subcontractors of every tier, will be required to execute a Letter of Assent, included in the enclosed PLA, agreeing to be bound by the PLA. The PLA has been approved by the Building and Construction Trades Department, AFL-CIO. **


Bidders for the construction of this project will be selected only after the review and evaluation of the qualification packages received in response to this notice.


Please note that the project drawings and specifications attached to DASNY’s website associated with this solicitation do not reflect 100% construction / bid documents. The documents provided are for reference only. Finalized construction / bid documents shall be distributed to the qualified contractors invited to bid.


Please find links to the specifications and drawings below:

380080 - Project Manual

380080 - Arch Drawings

380080 - ELE & FA Drawings

380080 - Food Service Drawings

380080 - HazMat Drawings

380080 - MEC Drawings

380080 - PLB Drawings

General Conditions for Construction dated February 4, 2026, will apply to the Contract Documents.

The anticipated goals for EEO and M/WBE participation in the Work of the Contract are as follows:

Percent of Total Work Force (EEO):

Minority & Women Workforce Goal (for all trades) 45%

Percent of Total Contract (M/WBE):

Minority Business Enterprise Goal 18%

Women's Business Enterprise Goal 12%

Service-Disabled Veteran Owned Businesses 6%

Please note the Owner will determine the goals for EEO and M/WBE participation when the finalized construction / bid documents are distributed to the qualified contractors invited to bid.

Firms shall provide one (1) copy in pdf format of the EOI package via e-mail to ccontracts@dasny.org.


Instructions for Submission of the EOI Packages:

Each firm responding to this solicitation shall submit an EOI package organized and assembled in a clear, logical and professional manner consistent with the requirements set forth herein. Failure to comply with these instructions may render the submission non-responsive and subject to rejection.


Each package shall be submitted with:

**1. ** A Cover Page that clearly identifies:

**· ** The Legal Name of the Company submitting the EOI

**· ** The Project Name for which the EOI is being submitted

**· ** The Date of Submission


**2. ** Immediately following the Cover Page, the contractor shall provide a Table of Contents listing all Tabbed sections, exhibits and attachments contained in the submission with the corresponding page number.


**3. ** The EOI package shall be divided into clearly labeled tabbed sections, each separated by a Cover Sheet identifying the contents that follow. Tabs should correspond to the order of the items specified in the solicitation.


**4. ** All items outlined in each Tab must be provided. The Owner may reject any EOI package not prepared and submitted in accordance with the provisions as stated in this solicitation.


**Tabs must be in the following sequence: **

Tab 1 – Company Profile

Provide a company profile that includes the following information:



· Company Contact – Name, Title, E-mail address, and Phone Number of primary point of contact for this project.

· Date Established – When the company was founded.

· Company Address – Primary business location.

· Ownership Information – Name and resumes of all principal owners.

· Client List – Summary of public and private sector clients.

· Employee Breakdown – Number of employees by role: Architects, Engineers, Project Managers, Administrative Staff, Superintendents and Foremen, Trade Laborers.


· Equipment - Overview of all equipment owned by the company.


· Self-Performed Services - Description of all services the company performs directly (not subcontracted).


· MWBE and SDVOB Certifications – Provide a copy of the company’s MWBE and/or SDVOB certifications (if applicable).

Tab 2 – Experience

Provide documentation showing a minimum of five (5) years of experience with projects similar in size, scope, and complexity to the one being proposed.

Provide details for the five (5) relevant projects that have been completed- or substantially completed- within the last ten (10) years.

For each project, include the following information:

· Name of the project designer

· Firm name and contact information

· Project title and location/facility

· Brief description of the project

· Total construction cost

· Construction start date

· Substantial completion date

· Indicate role as prime contractor or subcontractor

· Percentage of the work that was self-performed

If applicable, also include a list of all DASNY projects completed within the last 5 years.

Tab 3 – Project Schedules

Provide three (3) sample project schedules for the same projects listed in Tab 2. These schedules should reflect projects of similar size, scope, and complexity to the referenced project.

Tab 4 – Safety Program

Provide the firm’s written safety program or site safety plan. Include the résumé of the person responsible for overseeing project safety.

Tab 5 – Résumés

Provide names and résumés for the proposed project team. Each résumé should demonstrate experience with at least one project of similar size, scope, and complexity to the referenced project. Team members should include, at minimum: Project Manager, Site Superintendent, Project Engineer, and Quality Control Representative.

Tab 6 – Potential Subcontractors

Provide a list of potential subcontractors for this project. For each potential subcontractor, identify anticipated M/WBE subcontract participation, the subcontractor’s trade, and brief description of their scope of work.

Tab 7 – Anticipated Workload

Provide a list other projects you firm will be working on during this project’s construction period. Include a statement explaining how your firm will successfully complete this project within the required timeframe.

Tab 8 – Experience Modification Rating

Provide a letter from your insurance provider indicating the firm’s Experience Modification Rating (EMR) over the past three (3) years. If your EMR is above 1.00, include a written explanation.

Tab 9 – Bonding Capacity

Provide a signed letter from a Surety Company attesting to your firm’s single, aggregate and available bonding capacity. If your available bonding capacity does not to meet the bonding requirements of this contract, you must explain how your firm will meet the bonding requirements.

Tab 10 – NYS Vendor Responsibility Questionnaire

Provide your online or hardcopy NYS Vendor Responsibility Questionnaire For-Profit Construction (CCA-2) certified within the last five (5) months. Firms shall provide the Certification page for the online version or the full questionnaire, if submitting a hardcopy.

Eligibility/Qualifications Requirements/Preferences:


Tabs 1 through 7 will be scored by a DASNY committee. Firms deemed qualified from this solicitation will be included on a short list and invited to submit a bid in the near future. Firms not following the EOI package requirements as noted shall be considered non-responsive to the advertisement. The construction contract will be held by DASNY.


Contract Security, EEO/AA Insurance, NY State Vendor Responsibility Questionnaire (Executive Order 125). See Contract Documents for details.

In accordance with State Finance Law § 139-j and § 139-k, this solicitation includes and imposes certain restrictions on communications between Dormitory Authority personnel and an Offerer during the procurement process. Designated staff for this procurement are: The Project Manager and ccontracts@dasny.org. Contacts made to other Dormitory Authority personnel regarding this procurement may disqualify the Offerer and affect future procurements with governmental entities in the State of New York. Please refer to the Authority's website (www.dasny.org) for Authority policy and procedures regarding this law, or the OGS website (www.ogs.state.ny.us/aboutogs/regulations/defaultAdvisoryCouncil) for more information about this law. All proposers, domestic and foreign, must be in compliance with New York State business registration requirements. Contact the NYS Department of State regarding compliance. In addition, business entities proposing to provide professional engineering services must obtain a Certificate of Authorization to Provide Engineering Services in New York State from the State Education Department. Proposals must be submitted in the full legal name of the proposer, or the full legal name plus a registered assumed name of the proposer, if any.

Business enterprises awarded an identical or substantially similar procurement contract within the past five years:

None.

Service-Disabled Veteran-Owned Business (SDVOB)

SDVOB Goal: 6.00%

Minority / Women Business Enterprise contracting goals (MWBE)

MBE Goal: 18.00%

WBE Goal: 12.00%

Contacts

Primary Contact
Jeffrey Mason — Sr. Project Manager
Phone
518-669-8308
Address
65-30 Kissena Boulevard, Flushing, New York 11367, United States
Submit To Contact
Daria Khanafiev — Procurement Administrator
Phone
518-257-3700
Address
515 Broadway, Albany, New York 12207-2964, United States
Full source recordfrom New York State Contract Reporter
Title
CUNY Queens College Remsen Hall - Food Science Lab Renovation & Associated Hazmat Removal (EOI)
Ad Type
General
Agency
Dormitory Authority of the State of New York
Category
Construction Vertical: Building Construction; Rehabilitation & New Construction
Contacts
Name
Jeffrey Mason
Role
Primary Contact
Email
jmason@dasny.org
Phone
518-669-8308
Title
Sr. Project Manager
Address
65-30 Kissena Boulevard, Flushing, New York 11367, United States
Name
Daria Khanafiev
Role
Submit To Contact
Email
ccontracts@dasny.org
Phone
518-257-3700
Title
Procurement Administrator
Address
515 Broadway, Albany, New York 12207-2964, United States
Cr Number
2137144
Division
Construction
Location
Queens College, 66-50 Kissena Boulevard, Flushing, NY 11367
Has Detail
Yes
Due Date Raw
8/13/2026
Subcontract
No
Issue Date Raw
7/16/2026
Categorized By
llm

Source: New York State Contract Reporter (CR# NYSCR-2137144), retrieved via the nyscr.ny.gov statewide procurement bulletin. View the official posting — always confirm requirements and deadlines with the issuing agency.