We post new exterior maintenance opportunities as agencies publish them. Get them in one email — free, and unsubscribe whenever.
The Work of this Contract includes the following: 1 Removal of one (1) ground mounted cantilever sign structure and installation of (2) new ground mounted cantilever sign structures including removal and replacement of drilled shafts 2 Removal of two (2) ground mounted span sign structures and installation of two (2) new ground mounted span sign structures 3 Removal of one (1) bridge mounted span sign structure and installation of one (1) new bridge mounted span sign structure 4 Repair of 11 sign structures including galvanized coating repair, replacement of corroded or tightening fasteners, and reseat chord shim stacks 5 Removal of sign lighting at seven (7) existing sign structures and restoration of connections to existing electrical equipment 6 Removal and replacement of overhead guide sign panels and miscellaneous roadway signs at 15 sign structure locations 7 Clearing and Grubbing 8 Work zone traffic control 9 Erosion Control 10 Mill and overlay and guide rail replacement at miscellaneous locations Special Instructions: This contract includes the opportunity to receive an Enhanced Utilization Credit, which is designed to incentivize the use of MWBE firms that have had limited or no opportunity to engage in contracting with the MTA. The Enhanced Utilization Credit Initiative (EUCI), offered by the MTA in partnership with Empire State Development, allows an additional fifty percent (50%) credit toward the utilization of EUCI-eligible firms for this Contract. A list of EUCI-eligible firms is available at https://esd.ny.gov/certification-plus-vendors. For additional information on this program, see Article 18.17 of the General Provisions clause and Paragraph 17 of the Information for Bidders and you can also visit https://www.mta.info/doing-business-with- us/opportunities-for-hubs/euci.
Estimated value: $5M - $10M. Contract term: 487 Calendar Days - Max Substantial Completion. Funding: 100% Capital. M/WBE goals: 15% MBE 15% WBE 6% SDVOB.
The work includes removal of one ground mounted cantilever sign structure and installation of two new ones with drilled shafts; removal of two ground mounted span sign structures and installation of two new ones; removal of one bridge mounted span sign structure and installation of one new one; repair of 11 sign structures including galvanized coating repair, fastener replacement, and reseating chord shim stacks; removal of sign lighting at seven existing sign structures and restoration of connections; removal and replacement of overhead guide sign panels and miscellaneous roadway signs at 15 locations; clearing and grubbing; work zone traffic control; erosion control; and mill and overlay and guide rail replacement at miscellaneous locations.
Source: MTA Construction & Development (contract MP-9X/CB-9X), retrieved via the mta.info C&D contracting portal. View the official posting , always confirm requirements and deadlines with the issuing agency.