(1): Job JSR0059 Route 32 CEDAR, POLK County. Grading, pavement, drainage, bridge replacement and culvert replacement at Route CC, County Road 1350, and 2.3 miles west of Bolivar, over Barren Creek, and at Route 245 and Route 123, the total length of improvement being 3.119 miles.
(2): Job JSR0104 Route 160 DADE County. Grading, pavement and drainage from County Road 203 to Route 245, the total length of improvement being 0.407 miles.
Bid opening: 11/20/2026 (submit via Bid Express, https://www.bidx.com/).
Job JSR0059 on Route 32 in Cedar/Polk County includes grading, pavement, drainage, bridge replacement and culvert replacement at Route CC, County Road 1350, and 2.3 miles west of Bolivar, over Barren Creek, and at Route 245 and Route 123, with a total length of improvement of 3.119 miles. Job JSR0104 on Route 160 in Dade County includes grading, pavement and drainage from County Road 203 to Route 245, with a total length of improvement of 0.407 miles. The work also includes multiple pavement alternates (asphalt and concrete), guardrail, signing, bridge work, and erosion control items.
We post new asphalt opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Missouri Department of Transportation (solicitation 261120-G06), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.