Scope of Work shall include, but not be limited to: Provide all labor, equipment and materials for the partial demolition of the existing room DC1933 to incorporate a new hotel maintenance workshop including plumbing, HVAC, electrical, fire suppression, etc.
CONTRACTOR shall review all documents and scope of work provided by Miami-Dade Aviation Department (MDAD) for work to be completed. Please refer to the Plans & Specs for further description of the scope of work.
Contractors must agree to perform all work in accordance with the scopes of work established by MDAD, the MCC 7360 contract’s terms and conditions, all required permits and inspections and all applicable federal, state and local laws, codes and regulations. For the MCC 7360 General Contract Conditions, refer to the following link: https://intrax.miamidade.gov/ciis/STANDARD_CONSTRUCTION_GENERAL_CONTRACT_CONDITIONS_REVISED_7_1_2024.pdf
Any minor variation in the scope of work that is necessary to complete the intended work shall be considered incidental and will not warrant additional compensation. Any major variation encountered in the scope of work that is necessary to complete the intended work will be additional work and will be compensated through a contingency allowance account, dedicated allowance account, or change order. However, such major variation shall be completed without delay. Contractor shall use an adequate number of qualified workers who are thoroughly trained in the techniques required to properly complete the work specified. Contractor will own or have access to the equipment necessary and to meet all safety, insurance, and technical requirements of the owner and local, county, state, and federal regulating authorities. The grand total bid price shall be reflected on the RPQ Bid Form – Attachment 5A.
LICENSE:
Note: Pursuant to the requirements of Section 10-3 of the Code of Miami-Dade County, selected Contractors must possess a valid, current, and active State of Florida and/or Miami-Dade County contractor's license issued by the County's Construction Trades Qualifying Board and which is consistent with the requirements of their respective trade and the scope of work.
BID BOND AND PERFORMANCE & PAYMENT BOND:
Prospective bidders shall submit a Bid Bond at the time of Bid submission. Bidders may use the Surety Company standard bid bond. Alternatively, a certified or cashier’s check will be acceptable in lieu of the bid bond.
The Performance & Payment (P&P) bond must be submitted, using the contract specified form, within ten (10) working days from receipt of the Recommendation for Award (RFA) or time extension approved by the MDAD project manager. The P&P bond shall be required for the full contract amount. P&P Bond shall be submitted once the low “responsive and responsible” bidder is determined and the Recommendation for Award is issued. The cost of the Bid Bond and Performance & Payment Bond is not reimbursable and should be included in the lump sum amount (Item No. 1) of the Bid Form.
MDAD ENVIRONMENTAL POLICY:
Compliance with the Aviation Department (MDAD)'s Environmental Policy, ISO 14000 certification and Commissioning requirements will be strictly enforced by the MDAD PM. These requirements will be discussed during the mandatory pre- bid conference call. The awarded bidder shall comply with all requirements listed on the project plans, specifications and/or distributed separately following the mandatory pre-bid conference call.
SAFETY:
The awarded contractor is responsible for the safety and security of the job site. Any vandalism, theft, etc. which occurs during the construction time is the responsibility of the contractor. No monetary compensation shall be granted if any of the above occurs. If Contractor opts to hire an independent Security Company, such company is to be properly bonded and insured. Contractors shall provide an established safety program and implementation policy. Contractors’ safety programs shall be reviewed and approved by MDAD post-bid submittal and work orders shall not be issued to any contractor until their safety program is approved by MDAD. Refer to Resolution No. R-1181-18 for more information.
LIQUIDATED DAMAGES:
If the awarded contractor shall neglect, fail, or refuse to complete the work within the time specified for Substantial Completion in the Notice to Proceed (NTP), then the contractor hereby agrees, as part of the consideration for the awarding of this Contract, to pay to the Owner, as liquidated damages and not as a penalty, the sum of $430.71 per day for each calendar day beyond the dates set forth in the NTP and/or Work Order(s). The said amount is fixed and agreed on by and between the Contractor and the Owner because of the impracticability and extreme difficulty of ascertaining the true value of the damages which the Owner will sustain by failure of the Contractor to complete the Work on time, such as loss of revenue, service charges, interest charges, delays caused to other construction activities of Owner by failure to perform this Contract, and other damages, some of which are indefinite and not susceptible of easy proof. Said amount is agreed to be a reasonable estimate of the amount of damages which the Owner will sustain and said amount shall be deducted from any monies due or that may become due to the contractor, and if said monies are insufficient to cover said damages, then the Contractor shall pay the amount of the difference. Substantial completion does not relieve the contractor of completing the project in its entirety, nor does it obligate the owner to pay the entire contract price. Final acceptance is achieved when a Certificate of Completion (i.e., if required), acceptable warranties, final payrolls, final releases or acceptable Consent of Surety and documentation required in the contract documents has been submitted for approval to the MDAD project manager.
SECURITY REQUIREMENTS:
Badges are NOT required. However, the company must provide employees with an identifying marking such as reflective vests with company name for those that will be working inside the building. All bidders must contact the MDAD Security and Safety ID Section and the MDAD Landside Operations for the latest procedures and forms concerning badges and vehicle decals for access once the RFA is issued. Please refer to Attachment #11 in the Bid Documents for more information.
UTILITY CLEARANCES & SHUTDOWNS:
The awarded contractor shall be responsible for obtaining all utility clearances and coordinating all utility shutdowns at least 14 working days before initiating any work. Damage to existing equipment, utilities, MDAD or its business partners' property, etc. will be repaired and/or replaced at the contractor's expense. MDAD forms and procedures to obtain utility clearances and/or coordinate shutdowns will be distributed following the mandatory pre-bid meeting.
REQUEST FOR INFORMATION:
All requests for information (RFIs) shall comply with the Cone of Silence, Administrative Order 3-27 and shall be directed in writing to the MDAD project manager with a copy to the Clerk of the Board ( [email protected] ). The deadline to submit RFIs is no later than five (5) working days before the bid opening date and time specified on the RPQ and Invitation to Bid. MDAD will issue all changes and/or clarifications to the RPQ in writing via an Addendum. Verbal statements made by the County or the Owner’s Representative that are not contained in the RPQ or Addendum are not binding on the County and do not form any basis for a bidder’s response to a RPQ.
MINIMUM QUALIFICATIONS AND EXPERIENCE:
INDEMNIFICATION & INSURANCE:
Contractor is required to have proper insurance to cover ongoing work on the job site. The Contractor shall furnish certificates of insurance and insurance policies to the Owner prior to commencing any operations under this Contract. Certificates and policies shall clearly indicate that the Contractor has obtained insurance, as required for strict compliance with this specification. Compliance with the foregoing requirements shall not relieve the Contractor from liability under any other portion of this Contract. The Contractor shall be responsible for assuring that the insurance certificates required in conjunction with this section remain in force for the duration of the agreement. See attached for indemnification and insurance requirements.
MANDATORY PRE-BID MEETING & SITE VISIT:
Since a Microsoft Teams meeting does not require a physical presence, social distancing practices for COVID-19 are being adhered to. Bidders are still required/responsible for participating in the MANDATORY Microsoft Teams meeting. Failure to participate in the MANDATORY Microsoft Teams meeting shall result in the corresponding contractor/company being considered non-responsive. Contractors are extremely encouraged to join 5 minutes before the scheduled meeting time for a roll call. Late arrivals to the Microsoft Teams meeting shall result in the contractor/company being considered non-responsive.
The Microsoft Teams meeting will be recorded.
The join in instructions for the Microsoft Teams meeting are described below:
Join: https://teams.microsoft.com/meet/229338350342883?p=bPciUv37lpLpLm819F
Meeting ID: 229 338 350 342 883
Passcode: qL7W48DS
Dial in by phone
+1 786-687-2597,,113052668#
Phone conference ID: 113 052 668#
The agenda for the pre-bid Microsoft Teams meeting will be sent to you via email to be used during the meeting. Make sure you receive it, if not, please check your junk email or contact our office.
Bidders are responsible for attending the mandatory pre-bid Microsoft Teams meeting and site visit.
BID BOX:
The bid box is located in the hallway between Rooms B-205 and B-209 in MIA Bldg. 3030, B-Wing, 2nd Floor. If the time clock adjacent to the bid box is unable to stamp the bid envelope due to its thickness, please see Ms. Silvia Perez, Mr. James P. Ferreira or any MDAD representative at MIA Building 3030 to have bid envelopes signed, dated and timed prior to dropping them in the box.
BID SUBMITTAL:
All potential bidders are hereby notified that bids for this project must reflect a lump sum amount. The lump sum amount shall be indicated on the MCC-7360 Attachment 5A Bid Form. All quantities provided with the bid documents are estimated quantities based on the project scope of work. It is the bidder's responsibility to confirm any and all estimated quantities or amounts reflected on the bid documents to generate a "responsive and responsible" bid. Errors, omissions and/or discrepancies in quantities shall be brought-up to the attention of the MDAD team via the request for information (RFI) process during the bidding phase. Failure to confirm estimated quantities shall not constitute grounds for subsequent change orders. The lump sum bid amount shall be all inclusive to complete the work scope reflected on the construction bid documents. Bidders are responsible for all costs related to permitting, preparation of required shop drawings, special inspections, preparation of as-built drawings, close-out documentation and/or any engineering certificates required.
Contingency Allowance Account: for unforeseen conditions, construction changes, for additional work or materials not covered by other proposal items and for quantity adjustments, if ordered by the MDAD PM.
This account item is for all labor, materials, equipment and service necessary for modification or extra work required to complete the Project because of unforeseeable conditions, unforeseeable conflicts between existing elements of work and the proposed work; for minor changes required to resolve any unforeseeable conditions, Revised Regulations, Technological and Products Development, Operational Changes, Schedule Requirements, Program Interface, Emergencies and other miscellaneous costs; all if ordered by the MDAD PM. The Contingency Allowance Account is ten percent of the lump sum amount submitted in the RPQ Bid Form - Attachment 5A.
Payment to the CONTRACTOR under this item will only be made for work ordered in writing by the MDAD. Any portion of this fund remaining after all authorized payments have been made will be withheld from Contract Payments, and will remain with the County. If one account has been depleted and funds are available in the other accounts the MDAD PM may use some of the available funds to complete the Project.
Dedicated Allowance Account: for other unforeseen conditions (permitting, plan revisions, existing utility relocations, utility company service fees), construction changes and for quantity adjustments. The Dedicated Allowance Account is fixed at $25,000.00. Any portion of this fund remaining after all authorized payments have been made will be withheld from Contract Payments, and will remain with the County. If one account has been depleted and funds are available in the other accounts the MDAD PM may use some of the available funds to complete the Project.
F
The scope of work includes providing all labor, equipment, and materials for the partial demolition of existing room DC1933 to incorporate a new hotel maintenance workshop, including plumbing, HVAC, electrical, fire suppression, and related work. The contractor must review all documents and scope of work provided by the Miami-Dade Aviation Department (MDAD), perform work in accordance with MDAD's scopes of work, the MCC 7360 contract terms, all required permits and inspections, and applicable laws and codes. The contractor is responsible for obtaining all permits, coordinating utility clearances and shutdowns, maintaining daily logs, submitting construction progress schedules, and providing as-built drawings. The project includes a contingency allowance account of ten percent of the lump sum amount and a dedicated allowance account fixed at $25,000.00.
We post new hvac opportunities in Florida as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Miami-Dade County Strategic Procurement Department (solicitation DA100A), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.