5.07 mi of road reconstruction, grading, drainage, watermain and storm sewer replacement, noise wall replacement, guardrail, concrete sidewalk, ramps, curb and gutter, traffic signals, signing, ITS, lighting, pavement markings, reconstruction of 8 structures, rehabilitation of 20 structures, 1 deck park conversion, removal of 8 structures, and approach work on I-475 from Thread Creek to Flint River in the cities of Flint and Burton, Genesee County. This project is an Alternate Pavement Bid Project. Alternate 1 (Section 2) is an Hot Mix Asphalt Alternative and includes a 5 year materials and workmanship pavement warranty. Alternate 2 (Section 3) is a Concrete Alternative and includes a 5 year materials and workmanship pavement warranty. This project also includes a 5 year epoxy overlay performance warranty, a 2 year bridge coating warranty, and a 2 year concrete surface coating warranty.
In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications Ea, Fa and either B or Cb. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder.
Proposals and plans: http://mdotcf.state.mi.us/public/eprop/login/index.cfm
Reconstruction of 5.07 miles of I-475 including grading, drainage, watermain and storm sewer replacement, noise wall replacement, guardrail, concrete sidewalk, ramps, curb and gutter, traffic signals, signing, ITS, lighting and pavement markings, plus reconstruction of 8 structures, rehabilitation of 20 structures, conversion of 1 deck park, removal of 8 structures and approach work. Alternate 1 is a hot-mix asphalt alternative with a 5-year materials and workmanship pavement warranty and Alternate 2 is a concrete alternative with a 5-year materials and workmanship pavement warranty, with an additional 5-year epoxy overlay performance warranty, 2-year bridge coating warranty and 2-year concrete surface coating warranty.
We post new asphalt opportunities in Michigan as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Michigan work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Michigan Department of Transportation (solicitation 261120-702), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.