The City of Los Angeles seeks a qualified consultant engineering team to provide comprehensive design services for the Imperial Highway Green Infrastructure Project, transforming a 1.7-mile stretch of median into a multi-benefit green corridor.
The place of performance is Los Angeles, CA.
Key dates: posted 2026-09-03, due 2026-10-15.
The procurement method is Competitive Sealed Bid.
The issuing agency is Engineering Bureau, Public Works.
This TOS is only applicable to firms on the Pre-Qualified On-Call Wastewater and Environmental Engineering Services Consultants List.
Requirement: This TOS is only applicable to the firms on the Pre-Qualified On-Call Wastewater and Environmental Engineering Services Consultants List.
Method
Competitive Sealed Bid
These takeaways are AI-generated and may be incomplete or wrong. Always verify every detail against the official documents before you bid.
Provide comprehensive design services to implement the Imperial Highway Green Infrastructure Project.
Develop improvements to transform a 1.7-mile stretch of the Imperial Highway median into a multi-benefit green corridor.
Design shall implement stormwater management with active transportation, community safety, and urban greening elements.
Any subconsultants added to the contract not originally part of Schedule A must be registered with RAMP.
Posted Scope of Work
The City of Los Angeles, Bureau of Engineering (BOE) and LA Sanitation & Environment (LASAN) is seeking to retain a qualified consultant engineering team (Consultant) to provide comprehensive design services to implement the proposed Project. The selected Consultant will develop improvements to transform a 1.7-mile stretch of the Imperial Highway median into a multi-benefit green corridor. The final design shall successfully implement stormwater management with active transportation, community safety, and urban greening elements.
*Any subconsultants that have been added to the contract and not originally a part of Schedule A must be registered with RAMP.
**This TOS is only applicable to the firms on the Pre-Qualified On-Call Wastewater and Environmental Engineering Services Consultants List.
Scope, read from the documentsAI-generated
The selected Consultant will develop improvements to transform a 1.7-mile stretch of the Imperial Highway median into a multi-benefit green corridor. The final design shall successfully implement stormwater management with active transportation, community safety, and urban greening elements.
More architecture and design bids in California, weekly.
We post new architecture and design opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Questions & answers
AI-generated
What is the procurement method for this solicitation?
Competitive Sealed Bid.
Who is the contact person for this solicitation?
Elena Lopez, at elena.lopez@lacity.org, phone (213) 485-5705.
What is the due date for this solicitation?
2026-10-15.
Is this solicitation open to all firms?
No, this TOS is only applicable to the firms on the Pre-Qualified On-Call Wastewater and Environmental Engineering Services Consultants List.
Full source recordEvery field City of Los Angeles RAMP published, untouched
TOS No. 104 - Imperial Highway Green Infrastructure Project
Rampid
231781
Rampla
Stage
Open
Due Date
Oct 15, 2026
Doc Names
Attachment D - Imperial Highway Green Infrastructure Project Regional Program Scope of Work, Attachment A - Imperial Highway Green Infrastructure Project Feasibility Study, Attachment B - StreetsLA Imperial Highway Bike Lanes Project As-Builts, Attachment C - LAWA Imperial Highway Aesthetic Improvements Project Conceptual Plans, Attachment E - SCW Program Community Outreach and Engagement Program (COEP), Attachment F - StreetsLA Design Guidelines, Attachment G - Measure W Project Sign Design Guidelines, Attachment H - Stormwater Project Design Review and Comment Process, Attachment I - LASAN Clean Water Standard Design Guidelines of O&M, Attachment J - Reference Geotechnical Reports, Attachment K - Special Order No. 04-0222, Attachment L - Existing Recycled Water Infrastructure, Attachment M - Measure HLA, Attachment N - Regional Transfer Agreement, Attachment O - Storm Drain Design Plan Submittal Checklist, Attachment P - Task Work Order List of Subconsultants Form (Schedule B), Attachment Q - Non-Collusion Affidavit, Attachment R - Imperial Highway BMP Existing As-Builts, TOS No. 104 - Imperial Highway Green Infrastructure Project
Department
Engineering Bureau, Public Works
Contact Name
Elena Lopez
Description
The City of Los Angeles, Bureau of Engineering (BOE) and LA Sanitation & Environment (LASAN) is seeking to retain a qualified consultant engineering team (Consultant) to provide comprehensive design services to implement the proposed Project. The selected Consultant will develop improvements to transform a 1.7-mile stretch of the Imperial Highway median into a multi-benefit green corridor. The final design shall successfully implement stormwater management with active transportation, community safety, and urban greening elements.
*Any subconsultants that have been added to the contract and not originally a part of Schedule A must be registered with RAMP.
**This TOS is only applicable to the firms on the Pre-Qualified On-Call Wastewater and Environmental Engineering Services Consultants List.
Contact Email
elena.lopez@lacity.org
Contact Phone
(213) 485-5705
Organization
City of Los Angeles
Bidpost
Sep 3, 2026
Category
Personal Services
Closedate
Oct 15, 2026
Stagename
Open
Camis Tried
No
Department
Engineering Bureau, Public Works
Rampla Tried
Yes
Categorized By
llm
Surety · through Light RFPbid bond free · p&p flat 3%
Need a bond for this one? The bid bond is free.
Most California work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Not finding it?Describe the work in your own words and we’ll search the whole site.Search with AI →
Source: City of Los Angeles RAMP (bid 231781), retrieved via the City of Los Angeles. View the official posting, and always confirm requirements and deadlines with the issuing agency.