This project will rehabilitate approximately 2,698 linear feet of 24-inch concrete sewer using the Ultraviolet Cured-in-Place Pipe (UV CIPP) liner method. The proposed work will also include rehabilitating existing maintenance holes with Type I Liner, abandoning an existing offset maintenance hole, and upsizing existing 24-inch maintenance hole frame and covers to new 30-inch frame and covers. One (1) existing maintenance hole along the CBD Unit 15 alignment will not be upsized. The proposed work will also require performing sewer bypassing, traffic and odor control, and sewer cleaning. The project starts near the Hoover St & James M. Wood Blvd intersection; traverses through James M. Wood Blvd, Park View St, and 11th St; and ends at the Lake St & 11th St intersection.
● See bid package for full scope & details
●● Bid package only on RAMPLA- download Part 1 to be a planholder
● For planholders lists & bid results visit: http://engineering.lacity.gov/contractors/
The work includes rehabilitating approximately 2,698 linear feet of 24-inch concrete sewer using UV CIPP liner, rehabilitating existing maintenance holes with Type I Liner, abandoning an existing offset maintenance hole, upsizing existing 24-inch maintenance hole frame and covers to new 30-inch frame and covers, performing sewer bypassing, traffic and odor control, and sewer cleaning. The project starts near the Hoover St & James M. Wood Blvd intersection, traverses through James M. Wood Blvd, Park View St, and 11th St, and ends at the Lake St & 11th St intersection.
Source: City of Los Angeles RAMP (bid 231182), retrieved via the City of Los Angeles. View the official posting , always confirm requirements and deadlines with the issuing agency.