pavement patching, asphalt surface treatment, and related work.
Route(s): LA 2 ALT
Parish: Claiborne
Federal Number: H016583
Estimated Construction Cost: $500,000 to $1,000,000
Specbook: 2026
Letting: 10/14/2026 Headquarters — electronic bids via www.bidx.com, downloaded 10:00 a.m.
SPECIAL NOTICE TO CONTRACTORS: Bidders are required to certify their intent to comply with Section 102.14 of the 2026 Louisiana Standard Specifications for Roads and Bridges.
Schedule of items (13 pay items, quantities for information only):
0001 · 507-01-00100 · Asphalt Material (CRS-2P Emulsion) · GAL · 39,135
0002 · 507-02-00300 · Aggregate (S3) · SQYD · 126,243
0003 · 510-01-00200 · Pavement Patching (12" Minimum Thickness) · SQYD · 250
0004 · 713-01-00100 · Temporary Signs and Barricades · LUMP · 1
0005 · 713-04-01000 · Temporary Pavement Markings (Solid Line) (4" Width) · MILE · 19.501
0006 · 713-06-00200 · Temporary Reflectorized Raised Pavement Markers (Tabs) · EACH · 1,629
0007 · 724-01-00100 · Rumble Strips (Centerline) · MILE · 6.169
0008 · 724-02-00100 · Rumble Strips (Shoulder/Edge) · MILE · 12.338
0009 · 727-01-00100 · Mobilization · LUMP · 1
0010 · 731-02-00100 · Reflectorized Raised Pavement Markers · EACH · 1,130
0011 · 737-01-00100 · Painted Traffic Striping (Solid Line) (4" Width) · MILE · 39.002
0012 · 737-02-00100 · Painted Traffic Striping (Broken Line) (4" Width) · MILE · 7.552
0013 · 740-01-00100 · Construction Layout · LUMP · 1
The work includes pavement patching (12" minimum thickness), asphalt surface treatment with CRS-2P emulsion and aggregate, temporary signs and barricades, temporary pavement markings, temporary reflectorized raised pavement markers, rumble strips (centerline and shoulder/edge), reflectorized raised pavement markers, painted traffic striping (solid and broken line), mobilization, and construction layout.
We post new asphalt opportunities in Louisiana as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Louisiana work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Louisiana Department of Transportation and Development (solicitation H.016583.6), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.