clearing and grubbing, removal of pavement structure, borrow, in-place cement stabilized base course, in-place cement treated subgrade, lime treatment, roadway reinforcing mesh, asphalt concrete overlay, and related work.
Route(s): LA 694
Parish: Vermilion
Federal Number: H016564
Estimated Construction Cost: $1,000,000 to $2,500,000
Specbook: 2026
Letting: 10/14/2026 Headquarters — electronic bids via www.bidx.com, downloaded 10:00 a.m.
SPECIAL NOTICE TO CONTRACTORS: Bidders are required to certify their intent to comply with Section 102.14 of the 2026 Louisiana Standard Specifications for Roads and Bridges.
Schedule of items (39 pay items, quantities for information only):
0001 · 201-01-00200 · Clearing and Grubbing (Selective) · LUMP · 1
0002 · 202-01-00100 · Removal of Structures and Obstructions · LUMP · 1
0003 · 202-02-02000 · Removal of Asphalt Drives · SQYD · 158
0004 · 202-02-03030 · Removal of Pavement Structure · SQYD · 15,176.2
0005 · 202-02-06080 · Removal of Concrete Combination Curb and Gutter · LNFT · 55
0006 · 202-02-06100 · Removal of Concrete Walks and Drives · SQYD · 113
0007 · 203-07-00100 · Borrow (Vehicular Measurement) · CUYD · 196
0008 · 204-05-00100 · Temporary Sediment Check Dams (Hay) · EACH · 12
0009 · 303-01-00200 · In-Place Cement Stabilized Base Course (8-1/2" Thick) · SQYD · 15,856
0010 · 304-01-00100 · Lime · TON · 112.38
0011 · 304-03-00300 · Lime Treatment (Type C) (10" Thick) · SQYD · 7,928
0012 · 309-01-10000 · In-Place Cement Treated Subgrade (10" Thick) · SQYD · 15,856
0013 · 401-02-00100 · Aggregate Surface Course (Adjusted Vehicular Measurement) · CUYD · 868
0014 · 402-01-00101 · Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) · CUYD · 100
0015 · 502-01-00100 · Asphalt Concrete · TON · 4,707.6
0016 · 502-01-00200 · Asphalt Concrete, Drives, Turnouts and Miscellaneous · TON · 317.2
0017 · 511-01-00100 · Saw Cutting Asphalt Concrete Pavement · INLF · 55
0018 · 701-01-01021 · Cross Drain Pipe (30" RCP) · LNFT · 8
0019 · 701-15-00100 · Concrete Collar · EACH · 2
0020 · 706-02-00200 · Concrete Drive (6" Thick) · SQYD · 112.7
0021 · 712-02-00100 · Sacked Concrete Revetment · SQYD · 3
0022 · 712-04-00100 · Flexible Revetment · SQYD · 4
0023 · 713-01-00100 · Temporary Signs and Barricades · LUMP · 1
0024 · 713-03-01000 · Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) · MILE · 3.204
0025 · 713-03-02000 ·…
The work consists of clearing and grubbing, removal of pavement structure, borrow, in-place cement stabilized base course (8-1/2" thick), in-place cement treated subgrade (10" thick), lime treatment (Type C, 10" thick), roadway reinforcing mesh, asphalt concrete overlay, and related work. Specific items include 15,856 SQYD of cement stabilized base course, 7,928 SQYD of lime treatment, 15,856 SQYD of cement treated subgrade, 4,707.6 tons of asphalt concrete, 15,147 SQYD of roadway reinforcing mesh, 15,176.2 SQYD of removal of pavement structure, 868 CUYD of aggregate surface course, 10.533 miles of temporary pavement markings, 206 reflectorized raised pavement markers, and mobilization.
We post new asphalt opportunities in Louisiana as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Louisiana work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Louisiana Department of Transportation and Development (solicitation H.016564.6), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.