Generate a quick AI overview of this bid, pulled from its details and the attached documents.
This project is for a traditional breakpoint nutrient reduction wetland. In general, the work involves, but is not limited to, selective clearing, excavation, grading, steel sheet pile installation, tile installation, water control structure and seeding. This project includes about 12,950 cubic yards of earthwork, installation of 932 square feet of steel sheet pile, water control structure, 2,500 linear feet (LF) of tile installation, 59 LF of drawdown pipe, 532 tons of riprap, 106 cubic yards of concrete grout and 26.3 acres of seeding. The estimated construction cost range for this project is $450,000 to $550,000. Completion Dates: Construction: June 15, 2027 Seeding: June 30, 2027 (Buffer Seeding must be done within seeding period) September 15, 2027 (Structure Seeding must be done within seeding period)
Source: Iowa DAS Procurement (bid IOWA-26-05 Wri922420D (Wright)), retrieved via Iowa Department of Administrative Services. View the official posting — always confirm requirements and deadlines with the issuing agency.
Here are some similar opportunities
Let our AI help you find the right opportunity
Search with AI →