Bridge Deck overlay, bridge joint replacement and /repair include deck and approach patching, and substructure repair of (SN 016-0707) located on Canfield Avenue (FAU 2761), over John F. Kennedy Expressway (FAI-90), Chicago, IL.
Item: 012
Contract: 80C66
Region/District: 1 / 1
DBE goal: Pending%
VBP goal: Pending%
Federal Project: BR2G9R(470)
Key Routes: FAI 90
Marked Routes: I-90
Sections: (267-1515.F-15D) BJR, BDR 25
State Jobs: C-91-168-26
Contract specifics:
The work provides a bridge deck overlay, bridge joint replacement and repair including deck and approach patching and substructure repair of SN 016-0707 on Canfield Avenue over the John F. Kennedy Expressway in Chicago. Bridge work includes deck scarification, latex concrete overlay, deck grooving, deck slab repair, preformed joint strip seal, structural repair of concrete, fiber wrap, I-beam repair, cleaning and painting bearings, cleaning drainage systems, protective shield, protective coat, concrete sealer and acrylic coating. Roadway and roadside work includes earth excavation, hot-mix asphalt surfacing, curb and gutter, sidewalk and detectable warnings, inlets and drainage structures, and pavement markings, with traffic control and protection, nighttime work zone lighting, temporary concrete barrier, impact attenuators, and engineer’s field office.
We post new concrete opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Illinois Department of Transportation (solicitation 80C66), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.