Profile and slope adjustment, curb and gutter, ADA upgrades, drainage and intersection improvements on IL 37 (Logan Street) from south of North Douglas Street to south of Cleveland Street in West Frankfort. Also includes traffic signal modernization on IL 37 and IL 149 in West Frankfort.
Item: 132
Contract: 78B41
Region/District: 5 / 9
DBE goal: Pending%
VBP goal: Pending%
Federal Project: STPMLR2(503)
Key Routes: FAS 2887, FAP 873
Marked Routes: IL 149, IL 37
Sections: 12RS-8;(12,12-1)TS-2;106TS-1
State Jobs: C-99-084-25
Contract specifics:
The work includes profile and slope adjustment, curb and gutter, ADA upgrades, drainage and intersection improvements on IL 37 (Logan Street) from south of North Douglas Street to south of Cleveland Street in West Frankfort, and traffic signal modernization on IL 37 and IL 149 in West Frankfort. Pay items include tree removal, earth excavation, porous granular backfill, seeding, fertilizer, mulch, erosion control, aggregate subgrade improvement, aggregate surface course, bituminous materials, hot-mix asphalt binder and surface courses, portland cement concrete driveway pavement and sidewalk, detectable warnings, pavement removal, curb and gutter removal, sidewalk removal, class C patches, tie bars, concrete headwall removal, reinforcement bars, pedestrian railing, concrete collar, storm sewers, manholes, inlets, combination concrete curb and gutter, non-special waste disposal, soil disposal analysis, regulated substances pre-construction plan and final report and monitoring, engineer's field office, mobilization, traffic control and protection, traffic control surveillance, changeable message sign, short term pavement marking, temporary pavement marking, thermoplastic pavement marking, grooving for recessed pavement marking, raised reflective pavement marker, pavement marking removal, locating underground cable, service installation, underground conduit, handholes, unit duct, electric cable in conduit, luminaire, lighting controller, removal of lighting unit, full-actuated controller and cabinet, electric cable in conduit for signal and service, traffic signal post, pedestrian push-button post, concrete foundations, drill existing foundation and handhole, signal heads, pedestrian signal head, traffic signal backplate, remove existing traffic signal equipment, wireless ethernet radio, cellular modem, potholing, portland cement concrete sidewalk 6 inch (special), hot-mix asphalt surface removal variable depth, curb and gutter (special), traffic control and protection standard BLR 21, detour signing, concrete foundations ground mount, luminaire mounting bracket (special), ethernet switch, accessible pedestrian signals, steel combination mast arm assembly and pole, video and radar hybrid detection system, ground rod, concrete steps, construction layout, and traffic signal battery backup system.
We post new asphalt opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Illinois Department of Transportation (solicitation 78B41), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.