Culvert wing wall repairs on SN 059-7015 carrying IL 4 over unnamed ditch, 5.4 miles south of IL 108.
Item: 084
Contract: 72E77
Region/District: 4 / 6
DBE goal: Pending%
VBP goal: Pending%
Federal Project: N/A
Key Routes: FAP 662
Marked Routes: IL 4
Sections: (T)CLV
State Jobs: C-96-068-26
Contract specifics:
The work includes tree removal (0.100 acre), erosion control blanket (145 sq yd), stone dumped riprap (15 tons), concrete removal (3.4 cu yd), structure excavation (15 cu yd), concrete structures (3.4 cu yd), epoxy coated reinforcement bars (700 lb), temporary soil retention system (125 sq ft), granular backfill for structures (15 cu yd), mobilization, traffic control and protection, changeable message sign (50 calendar days), helical ground anchors (2 each), and structural steel repair (200 lb).
We post new wall-making opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Illinois Department of Transportation (solicitation 72E77), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.