This project is located on FAP 326 (IL-47) in the Morris Wetland bank east of IL-47 and south of the Illinois River in Morris and consists of beaver guard…
Illinois Department of TransportationIssuing agency·Illinois·via a public procurement portal
This project is located on FAP 326 (IL-47) in the Morris Wetland bank east of IL-47 and south of the Illinois River in Morris and consists of beaver guard removal.
The due date is November 06, 2026, and the completion date is May 01, 2028.
The issuing agency is the Illinois Department of Transportation.
The procurement method is Invitation for Bids.
The place of performance is IL.
The contract number is 66T80 and the item number is 070.
The DBE goal is Pending% and the VBP goal is Pending%.
The work includes mobilization and removal of tree trunk predator protection.
Questions must be submitted 7 calendar days prior to the scheduled bid opening date if an answer is desired.
Participation goal
DBE goal: Pending% VBP goal: Pending%
Term
Completion Date: May 01,…
Method
Invitation for Bids
Documents
1 file
These takeaways are AI-generated and may be incomplete or wrong. Always verify every detail against the official documents before you bid.
Want to know if you can be bonded for this project? Get prequalified.One free application, soft pull — sized to your work.
Know you can be bonded before you spend a week on the bid
No scramble for a bond at the deadline — it becomes a request form
Remove beaver guards from the Morris Wetland bank.
Perform mobilization as a base pay item.
Remove tree trunk predator protection (7,514 each).
Complete all work by May 01, 2028.
Requirements
From the documents
Participation goal
DBE goal: Pending% VBP goal: Pending%
Posted Scope of Work
This project is located on FAP 326 (IL-47) in the Morris Wetland bank east of IL-47 and south of the Illinois River in Morris and consists of beaver guard removal.
Surety · through Light RFPprequal free · bid bond free · p&p 3%
Need a bond for this one? Get prequalified once.
Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
Prequalified contractors know they can be bonded before they write the bid — and skip the application on every one of these. The bond becomes a request form and a copy of the RFP, not a scramble at the deadline.Prequalify For Bonding →What’s a good guy letter?
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Not finding it?Describe the work in your own words and we’ll search the whole site.Search with AI →
Source: Illinois Department of Transportation (solicitation 66T80), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.