Construct the 2026 Water Rehabilitation Project as shown in the drawings and specifications.
January 2026
REQUEST FOR PROPOSALS
CONTRACT, PLANS AND SPECIFICATIONS
FOR
CONSTRUCTING WATER REHABILITATION
FOR
THE BOARD OF WATER, LIGHT AND SINKING FUND COMMISSIONERS
OF
THE CITY OF DALTON, GEORGIA
2026 WATER REHABILITATION PROJECT
COMMISSIONERS
JOE YARBROUGH – CHAIRMAN
KEVIN BRUNSON
TOMMY BOGGS
ED ANTHONY
JACKIE KILLINGS
JOHN THOMAS
CHIEF EXECUTIVE OFFICER
TABLE OF CONTENTS
FOR
2026 WATER REHABILITATION PROJECT
FOR
THE WATER, LIGHT AND SINKING FUND COMMISSION
OF
THE CITY OF DALTON, GEORGIA
Advertisement for Bids……………………………………………….…………… 001113
Instructions to Bidders………………………………………………….…………. 002113
Bid…………………………………………………………………….…………… 004113
Non-Collusion Affidavit of Prime Bidder…………………………….…………... 004519
Corporate Certificate………………………………………………….…………… 004543
Statement of License Certificate…………………………………………………...
E-Verify Affidavit…………..……………………………………………………..
004546
004549
Construction Contract…………………………………………………………….. 005213
Performance Bond………………………………………………………………… 006113.13
Payment Bond…………………………………………………………………….. 006113.16
General Requirements and Conditions……………………………………….…… 007213
Allowances………………………………………………………………………… 012100
Owner Supplied Materials…………………………………………………………
Technical Specifications
012126
Trenching and Backfilling……………………………………………………. 312333
Erosion and Sedimentation Controls………………..………………………...
Boring and Jacking……………………………………………………………
312500
3330523.16
Asphalt and Concrete Pavement...……………………………………………
WC Roads Pavement Cut Detail
Water Main and Accessories…….……………………………………………
Attachments:
The work consists of furnishing all materials and equipment, except those specified in the Bid, and performing all labor necessary to construct the 2026 Water Rehabilitation Project as shown in the drawings and specifications. The project includes the construction of multiple roads: Carr Dr, Courtney Cir, Jacob Dr, Ina Dr, Hurricane Rd, Old Hurricane Rd, Rhine Rd, S. Hurricane Rd, Lake Rd, Lindsey Memorial Rd, Lower Gordon Springs Rd, Mountain View Dr, Palmer Dr, Rock Hill Dr. Rehab will consist of replacing existing pipe infrastructure, valves, fire hydrants, installing new services, connecting existing mains, driveway crossing (rock/concrete), etc. The Contractor’s work also includes all erosion, sedimentation, and pollution control necessary for the project. The Contractor will complete all necessary clean-up and restoration work to include filling, finish grading, grassing, landscaping, pavement repairs, driveway repairs, culvert repairs, drainage ditch restoration and other necessary restoration activities such that post construction conditions are EQUAL TO OR BETTER than those conditions that existed prior to any construction activity occurring.