Work to be done:
The work shall include the renovation and construction of a women's bathroom for the Coast Guard facility located at 563 Point Peter Road. The work shall include general construction, as well as electrical, plumbing, finishes, and fire protection improvements for the facility. More specific details are located in the Plans and Specifications and Contract Documents.
The Contractor shall provide the necessary labor, equipment, materials, and any other items and/or appurtenances required for a successful and complete project. All Work shall conform to the Project Plans and Specifications prepared by Larry L. Bryson, Architect, P.C., and all applicable local, state and federal codes and regulations. Contract time shall be 120 consecutive calendar days from the date of a Formal Notice to Proceed from the City of St. Marys.
NEW WOMENS
LOCKER ROOM
CLOSET
NEW
WOMENS
BATH
EXISTING MENS
LOCKER ROOM
EXISTING MENS
TOILET ROOM
EXISTING MENS
SHOWER ROOM
EXISTING CORRIDOR
FINISH SCHEDULE
26-02-3832
08/17/2026
08/17/2026
26-02-3832
08/17/2026
08/17/2026
26-02-3832
08/17/2026
08/17/2026
The Contractor shall convert an existing men's toilet to a women's combination toilet and shower and carve out an area of the men's locker room to create a women's locker room. The work includes evaluating existing plumbing, cutting and removing slab for a shower base, providing and installing all finishes including tile, gypsum board, primer, paint, and sealer, removing or relocating existing lockers and benches, reusing existing lights, adjusting drop ceilings and light switches, adjusting or adding sprinkler heads, smoke detectors, strobes, and emergency lights, adjusting or adding exhaust fans and air supply and return vents, providing all plumbing work including fixtures and trim, and connecting all plumbing systems to site services and testing for proper operation.
We post new bathroom opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: Georgia Procurement Registry (solicitation PE-66960-NONST-2027-000000059), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.