The work will include all equipment, materials, supplies, labor, and all other costs associated with construction of approximately 3,725 linear feet of roadway. The roadway includes the modification of a signalized intersections, sidewalks, drainage improvements, installation and maintenance of erosion, sediment and pollution control BMPs and final site stabilization. All work under this contract shall be done in accordance with the Georgia Department of Transportation (GDOT)
The work includes all equipment, materials, supplies, labor, and costs associated with construction of approximately 3,725 linear feet of roadway. The roadway includes modification of signalized intersections, sidewalks, drainage improvements, installation and maintenance of erosion, sediment and pollution control BMPs, and final site stabilization. All work shall be done in accordance with the Georgia Department of Transportation (GDOT). Specific items include traffic control, temporary grassing, mulch, construction exits, silt control gates, check dams, inlet sediment traps, water quality monitoring, grading, aggregate base courses, recycled asphalt concrete, concrete sidewalk, curb and gutter, storm drain pipe, guardrail, traffic signal installation, thermoplastic pavement marking, raised pavement markers, catch basins, drop inlets, storm sewer manholes, permanent grassing, and inductance loop detection systems.
We post new asphalt opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Georgia work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Georgia Procurement Registry (solicitation PE-66418-NONST-2026-000000023), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.