The City of Woodstock, Georgia, herein referred to as the City, is accepting bids from qualified contractors for the purpose of constructing an 8-foot multi-use trail & stormwater drainage improvements along Rope Mill Road from Inwood Walk North to across from Camelia Place, as well as a traffic calming island, hereinafter referred to as the "Project'. This includes but is not limited to concrete sidewalk installation, road widening, curb & gutter, storm drainpipe, catch basins, driveway reconstruction and thermoplastic striping.
12453 Highway 92, Woodstock, GA 30188
770-592-6000 ∙ www.woodstockga.gov
REQUEST FOR BIDS
For
Rope Mill Road Trail Connection
RFB NUMBER
2027 – 03
RELEASED:
August 20th, 2026
DUE:
September 22nd, 2026 10:00 A.M. EST
For all questions about this RFB contact:
Martyn Detz
Financial Analyst: Purchasing
770-592-6000 Ext 1205
www.bidnetdirect.com//cityofwoodstock
TABLE OF CONTENTS
1.0 PURPOSE OF SOLICITATION ........................................................................................................................ 4
1.1 PURPOSE OF BID............................................................................................................................................. 4
1.2 RFB SUBMISSION ........................................................................................................................................... 4
1.3 SCHEDULE OVERVIEW ...................................................................................................................................... 4
1.4 PRE-BID MEETING .......................................................................................................................................... 5
1.5 RFB COSTS.................................................................................................................................................... 5
1.6 RFB QUESTIONS/COMMUNICATIONS ................................................................................................................. 5
1.7 RFB AMENDMENTS ........................................................................................................................................ 6
1.8 NON-COLLUSION AFFIDAVIT .............................................................................................................................
The work includes site preparation, grading & earthwork; roadway, trail & driveway construction (including 532 SY of 4-inch concrete sidewalk, 1,720 LF of curb & gutter, and asphalt paving); stormwater drainage infrastructure (437 LF of 18-inch and 195 LF of 24-inch storm drainpipe, 7 catch basins); traffic control & maintenance of traffic; signage & thermoplastic pavement markings (1,710 LF of solid white stripe, 560 LF of solid yellow stripe); erosion & sedimentation control; and utility coordination. All work shall conform to GDOT and City of Woodstock standards.
We post new asphalt opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: Georgia Procurement Registry (solicitation PE-62853-NONST-2027-000000028), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.