The RIB Rehabilitation Project scope of work includes the rehabilitation of deteriorated RIBs over a three (3) year period as described below: FY 2027 (Oct 1, 2026- Sept 27): Cells 66, 67, 68, 69, 70 FY 2028 (Oct 1, 2027- Sept 28): Cells 48, 49, 50, 52, 53 FY 2029 (Oct 1, 2028- Sept 29): Cells 57, 58, 60, 71, 72 Rehabilitation consists of removal and disposal of the existing 45 mil Hypalon liners, along with supplying and installing new 60 mil HDPE liners, including earthwork and grading. The work includes excavation and backfilling of anchor trenches as well as supplying and installing new batten bars where necessary (existing batten bars can be re-used, where possible). Concrete work, as needed to complete the task, is included as an allowance amount.
The work also includes earthwork inside the RIB cells and on the berms including the sodding of all berm tops and exterior slopes and any additional restoration efforts needed. You must be a registered bidder through PlanetBids™ to obtain the supporting attachments to this project. BID LINK HERE: https://vendors.planetbids.com/portal/62171/bo/bo-detail/145460 Commodities: Filter media; Irrigation system construction service; Storm water drainage; Underground utilities construction service; Park and garden construction and or remodelling service; Drainage system construction service; Dredging service; Pond construction service; Groundwater pollution drainage services
The RIB Rehabilitation Project scope of work includes the rehabilitation of deteriorated RIBs over a three (3) year period as described below: FY 2027 (Oct 1, 2026- Sept 27): Cells 66, 67, 68, 69, 70 FY 2028 (Oct 1, 2027- Sept 28): Cells 48, 49, 50, 52, 53 FY 2029 (Oct 1, 2028- Sept 29): Cells 57, 58, 60, 71, 72 Rehabilitation consists of removal and disposal of the existing 45 mil Hypalon liners, along with supplying and installing new 60 mil HDPE liners, including earthwork and grading. The work includes excavation and backfilling of anchor trenches as well as supplying and installing new batten bars where necessary (existing batten bars can be re-used, where possible). Concrete work, as needed to complete the task, is included as an allowance amount. The work also includes earthwork inside the RIB cells and on the berms including the sodding of all berm tops and exterior slopes and any additional restoration efforts needed.
We post new excavating opportunities in Florida as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Florida work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: Central Florida Tourism Oversight District (solicitation 16866), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.