The work is the removal of six existing full-duplex switchboard sections and the supply and installation of seven new full-duplex switchboard sections at SWPA's New Madrid Substation, 292 Business Loop 55, New Madrid, MO 63869.
Key dates: site visit on 16 Sep 2026, questions due 21 Sep 2026, and offers due 05 Oct 2026.
The solicitation is a Request for Quotation (RFQ) issued by the U.S. Department of Energy, Southwestern Power Administration, with a firm-fixed price contract contemplated.
The scope includes modifications, cable additions, wiring changes, factory testing, and disposal of removed equipment, with all work performed Monday through Thursday, 7:00AM–5:30PM, excluding federal holidays.
The contractor must furnish all materials except temporary relay racks, which are government-furnished but contractor-connected.
The foreman must have a minimum of 3 years' experience as a foreman in this type of work and hold current first aid and CPR certificates.
Requirement: The foreman shall have a minimum of 3 years’ experience as a foreman in the type of work contained in these specifications and shall have demonstrated knowledge of applicable OSHA safety standards.
Requirement: The foreman’s resume shall include current first aid and CPR certificates.
Method
Request for Quotation (RFQ)
Documents
10 files
These takeaways are AI-generated and may be incomplete or wrong. Always verify every detail against the official documents before you bid.
Remove six existing full-duplex switchboard sections and dispose of them at the New Madrid Substation.
Furnish, fabricate, and install seven new full-duplex switchboard sections, including all relays, switches, wiring, terminal blocks, and nameplates.
Prepare and connect existing temporary relay racks to maintain system functionality during construction, then disconnect and remove old sections.
Perform all modifications, cable additions, wiring changes, factory tests, and field acceptance tests as specified in the Statement of Work and drawings.
Deliver all equipment to the site and provide as-built drawings and project record documents within 10 calendar days after completion.
Posted Scope of Work
Removal and replacment of six (6) existing full-duplex switchboard sections at SWPA’s New Madrid Substation with seven (7) new contractor-supplied sections.
Solicitation — DOE - DOE / Southwestern Power Administration
PSC 6110 · NAICS 335313 · Ref 89503626QSW000213
More electrical bids, weekly.
We post new electrical opportunities as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Removal and replacment of six (6) existing full-duplex switchboard sections at SWPA’s New Madrid Substation with seven (7) new contractor-supplied sections.
Contact Email
andrew.monroe@swpa.gov
Description Full
Removal and replacment of six (6) existing full-duplex switchboard sections at SWPA’s New Madrid Substation with seven (7) new contractor-supplied sections.
State By
none
Issue Date
9/4/2026
Ref Number
89503626QSW000213
Stage Type
Solicitation
Response Date
10/05/2026 05:00 PM US/Eastern
Categorized By
llm
Detail Fetched
Yes
Issuing Office
Southwestern Power Administration
Attachments Parsed
Yes
Surety · through Light RFPbid bond free · p&p flat 3%
Need a bond for this one? The bid bond is free.
Most public work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Not finding it?Describe the work in your own words and we’ll search the whole site.Search with AI →
Source: DOE - DOE (solicitation 89503626QSW000213), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.