Takeaways by LightRFP AI
  • This solicitation is for the Stegall Substation Stage 07 Phase 01 project, which involves equipment replacements and upgrades.
  • The project replaces end-of-life equipment including the 1960's era control building, 30+ disconnect switches, brown glass insulators, main bus reconductor, 2-115kV oil circuit breakers, and a 1990's vintage GE D20 RTU.
  • A new control building will be installed, and a transfer bus dead end structure will be added between the 230kV east and west interconnect.
  • The issuing agency is DOE - DOE / Western Rocky Mountain Region.
  • The post date is 2026-06-25 and the response due date is 2026-08-10 at 04:00 PM US/Eastern.
  • A vendors conference is scheduled for 2026-07-09 at 10:00 AM.
  • This is a Total Small Business Set-Aside (FAR 19.5).
  • Requirement: Attachments titled 'Bid, Performance, Payment Bonds' and 'SF24-16e.Bid.Bond (Blank)' are included, indicating bonding requirements.

AI-generated, verify all details against the official documents.

Description

The Stegall Substation Stage 07 Phase 01 Project (Equipment Replacements and Upgrades) replaces end of life equipment and installs a new control building. Replaced equipment shall include the 1960’s era control building, 30+ disconnect switches, problematic brown glass insulators, main bus reconductor and rating increase, 2-115kV oil circuit breakers, replace 1990’s vintage GE D20 RTU with three SEL RTACs, and add transfer bus dead end structure between 230kV east and west interconnect.

Solicitation — DOE - DOE / Western Rocky Mountain Region
PSC Y1PZ · NAICS 237130 · Ref 89503226BWA000075

Documents10
89503226BWA000075Link
022. Sol 89503226BWA000075Link
Attch A. SG.07_Compiled_Spec_REV00Link
Attch B. SG.07_final_drawings_05_28_26Link
Attch C. SG.07_SubBiddingScheduleLink
Attch E1. WD Scotts Bluff Cnty, NE (Bldg) NE20260079 -05.18.20262026
Attch E2. WD Scotts Bluff Cnty, NE (Hvy) NE20260048-05.18.20262026
Attch E3. WD Scotts Bluff Cnty, NE (Hwy) NE20260030-05.18.20262026
Attch F. Bid, Performance, Payment BondsLink
Attch F1. SF24-16e.Bid.Bond (Blank)Link

Contact

Name
John Pratt
Full source recordfrom DOE - DOE
Psc
Y1PZ
Naics
237130
Title
Stegall Substation Stage 07 Phase 01
Agency
DOE - DOE
Detail
Fields
Email
jpratt@wapa.gov
NAICS
237130-Power and Communication Line and Related Structures Construction
Agency
DOE
Contact
John Pratt
PSC / FSC
Y1PZ-CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
Set Aside
Total Small Business Set-Aside (FAR 19.5)
Issue Date
06/25/2026
Response Due
08/10/2026 04:00 PM US/Eastern
Reference Number
89503226BWA000075
Vendors Conference
07/09/2026 10:00 AM
Documents
Node
s89503226BWA000075\157644\SUPPORTDOC,2656297
Title
89503226BWA000075
Node
s89503226BWA000075\157644\SUPPORTDOC,2656300
Title
022. Sol 89503226BWA000075
Node
s89503226BWA000075\157644\SUPPORTDOC,2656302
Title
Attch A. SG.07_Compiled_Spec_REV00
Node
s89503226BWA000075\157644\SUPPORTDOC,2656303
Title
Attch B. SG.07_final_drawings_05_28_26
Node
s89503226BWA000075\157644\SUPPORTDOC,2656308
Title
Attch C. SG.07_SubBiddingSchedule
Node
s89503226BWA000075\157644\SUPPORTDOC,2656309
Title
Attch E1. WD Scotts Bluff Cnty, NE (Bldg) NE20260079 -05.18.2026
Node
s89503226BWA000075\157644\SUPPORTDOC,2656310
Title
Attch E2. WD Scotts Bluff Cnty, NE (Hvy) NE20260048-05.18.2026
Node
s89503226BWA000075\157644\SUPPORTDOC,2656311
Title
Attch E3. WD Scotts Bluff Cnty, NE (Hwy) NE20260030-05.18.2026
Node
s89503226BWA000075\157644\SUPPORTDOC,2656299
Title
Attch F. Bid, Performance, Payment Bonds
Node
s89503226BWA000075\157644\SUPPORTDOC,2656298
Title
Attch F1. SF24-16e.Bid.Bond (Blank)
Contact Name
John Pratt
Description
The Stegall Substation Stage 07 Phase 01 Project (Equipment Replacements and Upgrades) replaces end of life equipment and installs a new control building. Replaced equipment shall include the 1960’s era control building, 30+ disconnect switches, problematic brown glass insulators, main bus reconductor and rating increase, 2-115kV oil circuit breakers, replace 1990’s vintage GE D20 RTU with three SEL RTACs, and add transfer bus dead end structure between 230kV east and west interconnect.
Contact Email
jpratt@wapa.gov
Description Full
The Stegall Substation Stage 07 Phase 01 Project (Equipment Replacements and Upgrades) replaces end of life equipment and installs a new control building. Replaced equipment shall include the 1960’s era control building, 30+ disconnect switches, problematic brown glass insulators, main bus reconductor and rating increase, 2-115kV oil circuit breakers, replace 1990’s vintage GE D20 RTU with three SEL RTACs, and add transfer bus dead end structure between 230kV east and west interconnect.
State By
none
Issue Date
6/25/2026
Ref Number
89503226BWA000075
Stage Type
Solicitation
Response Date
08/10/2026 04:00 PM US/Eastern
Detail Fetched
Yes
Issuing Office
Western Rocky Mountain Region
Attachments Parsed
Yes

Source: DOE - DOE (solicitation FEDCONNECT-89503226BWA000075), retrieved via a public procurement portal. View the official posting — always confirm requirements and deadlines with the issuing agency.