DCAMM Certified Prime HVAC - Prime or Mechanical Prime for the Chiller Plant Replacement, TRC2556-FT1 for the Palmer District Court.
The project consists of the replacement of the existing air-cooled split chiller system, with a new packaged air-cooled chiller with R-32 Refrigerant.
The project consists of the replacement of the existing air-cooled split chiller system at the Palmer District Court in Palmer, Massachusetts with a new packaged air-cooled chiller utilizing R-32 refrigerant. Work includes removal of the existing rooftop condensing unit and interior evaporator, installation of a new outdoor packaged chiller on a housekeeping pad with security and privacy screening. The work also includes the installation of a new water to propylene glycol solution heat exchanger system dedicated to the existing rooftop air handling unit. The project will be performed in an occupied courthouse and shall be coordinated to maintain ongoing operations.
We post new hvac opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: COMMBUYS (Massachusetts) (bid BD-27-1107-FREG5-ACCOU-133065), retrieved via the Massachusetts COMMBUYS open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.