Inspection and testing of the following systems: wet pipe system, dry pipe system, diesel fire pump, sprinkler valve post indicator, annual fire hydrant testing, all sprinkler devices, and all trip testing for the NFPA. Testing will also be required for the fire pump and hydrants. The contract will be for a three (3) year period.
Pre-Bid Conference: A MANDATORY Pre-Bid Conference will be held at 10 AM on Wednesday, 06/24/26. Contractors should meet the Project Engineer at Power Plant, Taunton State Hospital 60 Hodges Ave. Taunton, MA 02780. Questions must be uploaded by Friday, 06/26/26 12 PM.