Las Vegas Boulevard - Flamingo Road to Spring Mountain Road (Phase G) and Flamingo Road - I-15 to Koval Lane
Improvements on Las Vegas Boulevard from Flamingo Road to Spring Mountain Road, approximately one mile, including cold planing, plantmix bituminous surface, UTACS, pedestrian protection devices, curb and gutter reconstruction, sidewalk reconstruction and widening, sidewalk ramps, median reconstruction, bus turnouts, street lights and Smart poles, LED landscape lighting conversion, landscaping and irrigation modifications, traffic signal modifications at 6 intersections, utility adjustments, storm sewer facilities, pavement markings, signing, power and communication system installation and connection to new Smart poles, plus a new waterline for the entire length to replace an existing Las Vegas Valley Water District waterline, and improvements on Flamingo Road from I-15 to Koval Lane, approximately three quarters of a mile, including curb and gutter, ADA sidewalk replacement, traffic signal modifications with detector loops, utility adjustments, cold planing, plantmix surface, UTACS, storm drain installation, permanent striping and signing, and LED street lighting luminaires.
We post new other opportunities in Nevada as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Nevada work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: Clark County (solicitation BID-608087-26), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.