The City of Collinsville is soliciting bids for the construction of the Water Distribution Line Project in Collinsville, Grayson County, Texas. The project consists of furnishing and installing approximately 6,060 linear feet of 8-inch AWWA C900 DR-18 PVC water line by open cut along Graham Grove Road. Work also includes connection to existing water lines, provisions for future connections, installation of valves, fittings, thrust restraint/blocking, utility markers, and all appurtenant items necessary for a complete and operational water line, including testing and site restoration. The work to be performed includes furnishing all labor, materials, equipment, insurance, bonds, and incidentals required to complete the work in accordance with the Contract Documents.
Type of work: Construction of a Water Distribution Line in Collinsville, TX
Pre-bid meeting: October 26, 2026 at 2:00 PM (Chicago) — The City of Collinsville City Hall, 101 North Main Street, Collinsville, Texas 76233 — Non-mandatory pre-bid meeting
Bid opening: November 3, 2026 at 2:00 PM (Chicago) — The City of Collinsville City Hall, 101 North Main Street, Collinsville, Texas 76233
Questions due: October 29, 2026 at 5:00 PM (Chicago)
Questions asked: 2
Bid documents (download requires a free CivCast account):
The project consists of furnishing and installing approximately 6,060 linear feet of 8-inch AWWA C900 DR-18 PVC water line by open cut along Graham Grove Road. Work also includes connection to existing water lines, provisions for future connections, installation of valves, fittings, thrust restraint/blocking, utility markers, and all appurtenant items necessary for a complete and operational water line, including testing and site restoration. The work to be performed includes furnishing all labor, materials, equipment, insurance, bonds, and incidentals required to complete the work in accordance with the Contract Documents.
We post new plumbing opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>The bid date is Tuesday, November 3, 2026. An addendum will be issued to correct the November 2, 2026, bid date currently shown in the contract documents to November 3, 2026.</p>""d84ee5ef-7f14-48bd-bbd7-28115378d9b7""2026-10-20T14:07:05.196Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6ad289ea48410f98bb97736c), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.