This project includes an existing 500,000-gallon welded steel elevated storage tank to be rehabilitated and repainted. The work to be performed under these specifications includes the rehabilitation, repainting, and structural steel repairs of the water storage tank. This contract shall include all necessary superintendence, labor, materials, equipment, tools, piping, field jointing, cleaning, grouting, excavation, trenching, shoring, fill, grading, backfill, surface restoration, testing, hauling and disposal of excess soils, and incidental items necessary for the construction of the proposed facilities as shown in the plans and documented in the specifications. The Contractor is responsible for the restoration of all disturbed surfaces, including pavement. All surfaces shall be returned to original condition or better. Prior to the start of construction, the Contractor shall submit a construction schedule to the engineer detailing his anticipated activities with estimated dates for the completion of each activity and section. The Contractor shall be responsible for the startup and testing of each system embraced in this Contract. All systems shall be demonstrated to be functioning at design conditions prior to being considered complete. Where requested or required by the Engineer, the Contractor shall submit test data and certify in writing that the systems tested performed as required by the plans and specifications at design conditions.
Pre-bid meeting: October 27, 2026 at 1:30 PM (Chicago) — Microsoft Teams https://teams.microsoft.com/meet/252954652800556?p=k8pfajkZIAf6Uu1N8s +1 346-202-6170 Phone conference ID: 560 059 858# — Non-mandatory
Bid opening: November 4, 2026 at 2:00 PM (Chicago) — City of Bridge City, Texas, City Hall, 260 Rachal Avenue, Bridge City, TX 77611
Questions asked: 2
Bid documents (download requires a free CivCast account):
The work includes all necessary superintendence, labor, materials, equipment, tools, piping, field jointing, cleaning, grouting, excavation, trenching, shoring, fill, grading, backfill, surface restoration, testing, hauling and disposal of excess soils, and incidental items necessary for construction. The contractor is responsible for restoration of all disturbed surfaces, including pavement, and must submit a construction schedule, perform startup and testing of each system, and certify in writing that systems performed as required.
We post new roofing opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6ad24c1c717954e41fabc50d), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.