Main Street Lift Station is experiencing unusually high flows due to infiltration in the wastewater system. In order to prevent wastewater backups in the system as well as provide emergency powered backup for the current lift station it is proposed that a Dri-Prime Backup System (DBS) be installed. The existing force main system will be utilized for the increased flows and a new outfall manhole structure will be constructed on Todville Road.
Type of work: Pump and associated piping at lift station
Engineer's estimate: $680,000 - $700,000
Pre-bid meeting: October 27, 2026 at 2:00 PM (Chicago) — Seabrook City Hall
Bid opening: November 3, 2026 at 2:00 PM (Chicago) — Seabrook City Hall
Questions due: October 29, 2026 at 5:00 PM (Chicago)
Questions asked: 1
Bid documents (download requires a free CivCast account):
Install a Dri-Prime Backup System (DBS) at the Main Street Lift Station to prevent wastewater backups and provide emergency powered backup. Utilize the existing force main system for increased flows and construct a new outfall manhole structure on Todville Road, with pump and associated piping work at the lift station.
We post new appliances opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>A natural gas engine pump is preferred at this location.</p>""109444c5-000b-4b17-9f48-a556cee68aa8""2026-10-14T14:36:26.926Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6ace4e59cf079311ed50d52f), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.